Removal & Re-Fixing Of Aluminum Insulation Sheeting On Water Wall Tubes Around Soot Blowers And Burner Panels, Hot Venturi Ducting Of Mills, Hot Air Bus Ducts, Inter Connecting Duct Over Aph And Id Fan To Chimney Areas Of Boiler In Unit-7 During Annual Overhaul Period 2024-25.
Supply Of Soot Blower Spares -Packing Set + Sbv, Pn 963534240000, Chain Assembly, P/N:842083190916, Sb Valve Assy, P/N:842083110400, Travelling Carriage Assembly, Feed Tube Assembly, P/N:842083190716, Lance Assy, P/N:842083193615, Lrs-Ie Power Pack Without Motor, Tc Packing Set P/N 963534230000, Sb Valve Assembly, P/N:842030101801, Rbie, , Ss Blowing Element, P/N:842062104000, , Cs Blowing Element, P/N:842072103400, Power Pack W/O Motor, P/N:963533010001, Packing Set Grafoil 3 Ring, 963535270000, Valve Stem Packing-5 Rings Grafoil
Overhauling Of Water Wall Soot Blowers, Long And Half Retractable Soot Blowers And Assisting In Floating Of Safety Valves Of Unit -7 Boiler During Annual Overhaul- 2024-25.
Procurement Of Soot Blower Spares Of Unit-3 & 4 Boilers
Soot Blower Lr Components Machining Favsb3744
Overhauling, Servicing And Checking The Lt Switch Gear Of Soot Blower, Lrsb, Ah Blower And Attending The Fault Of Various Soot Blower Circuit And Control System During The Oh 7, 2X500 M.W., Dtpp, Anpara