The Work Of Complete Cleaning Of Empty Wagons At W/T No. 1 To 4, On Railway Tracks And Transporting Of Emptied Coal To Stack Yard Or Manual Hopper At Gandhinagar Tps, As And When Required Basis.
Supplying And Stacking Of Ballast At Nandikoor Station Yard And Loading Into Krcl Hoppers For Ctr Works Under Sen/Udupi Section In Senior Regional Engineer, Karwar Region Of Konkan Railway Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable Extra As Applicable.
Manufacturing, Supply And Stacking Of Machine Crushed Track Ballast Including Leading And Loading At Hirisave Hise Depot Quantity 12510 Cum In Connection With The Work Of Chikka Banavara Sec : Through Ballast Recoupment For A Length Of 7.881 Km In Looplines Of B G Nagar Bgnr, Hirisave Hise, Shravanabelagola Sbga, Channarayapatna Cnpa And Samudravalli Dsvs Yards
Manufacturing, Supply And Stacking Of Machine Crushed Track Ballast Including Leading And Loading At Periya Naga Thunai Prnt Depot Quantity 21, 150 Cum In Connection With The Work Of A Bengaluru-Salem Section : Increasing Sleeper Density Of Existing 52Kg Psc Sleepers Of 1310/Km To 1540/Km For A Length Of 9.565Km In Loop Lines Of Aden/Dharmapuri, B Chikka Banavara - Hassan Section : Through Ballast Recoupment Of Points And Crossings At Nelamangala Nmga Yard - 08 Nos., C Through Ballast Recoupment Of Points And Crossings At Dharmapuri Dpj, Rayakottai Ryc, Periya Naga Thunai Prnt, Kelamangalam Kmlm And Banaswadi Band Yards - Total 11 Nos., D Bengaluru - Salem Sec : Through Ballast Recoupment Of Points And Crossings 10 Nos., At Hosur Hsra Yard. Sw Ii : Bengaluru - Salem Sec : Supply And Dumping Of Ballast In Connection With The Work Of Construction Of Track Machine Siding At Rayakottai Ryc Station In Aden/Dharamapuri Section.
Turnkey Mining Contract Involving Overburden/ Inter Burden Removal, Excavation And/Or Loading Of Lignite From Mines Face And Ancillary Activities At Damlai Lignite Project, Bharuch. Lignite Excavation & Loading Equals To 162.5 Lakh Mt Ob/Ib Removal Equals To 1870 Lakh M3 2. Combined Work Of Transportation Of Lignite From Mine Face To Surface Stack Yard And Loading Of Lignite There From Of 41 Lakh Mt 3. Excavation And Transportation Of Loose Ob From Inside The Pit To The Dumps And Ancillary Activities Of 47 Lakh M3 Above Quantities Are Tentative And Indicative Only And May Vary At The Time Of Execution Of Actual Work.