Repair Of Various B/R Related Items -2Nd Class Hard Wood 35Mm Thick Made Glazed And Skeleton Shutters, 30Mm Thick Flush Shutters, Solid Pvc Door Frame, Mild Steel Flat Iron, Stainless Steel Wire Cloth Etc
Supply Of Super Duplex Stainless Steel
Supply Of Moisture- Separator With Complete Stainless Steel Screwed End, Size- 1, Wp-0.16 Kg/Cm2, Body Material - Stainless Steel. Warranty Period: 30 Months After The Date Of Delivery Mechanical Auto Drain Valve, Size-3/8, Wp-0-16 Kg/Cm2. Body Material - Aluminum. Automatic Drainage. Warranty Period: 30 Months After The Date Of Delivery
Supply of Steel Almirah Big Size With Pigeon Hole 1 Almirah Height : 1980 Mm 2 Almirah Width : 910 Mm 3 Almirah Depth : 480 Mm 4 Almirah Selves : 11 Selves 5 Almirah Pigeon Hole In Every Selves: 06 Squir E Hole In Each Selves. 6 Materials : Stainless Steel 7 Steel Sheet Thickness For All Side Will Be 0.8 Mm Warran Ty Period: 30 Months After The Date Of Delivery
Removal, Repair Of Floor. 2. Supply & Application Of Polymerized Floor Topping Compound For F Looring Of Lavatory Inlays/Frp. 3. Stripping, Supply & Fitment Of I Inside Mirror With Complete Side Polish. Ii Out Side Mirror. Iii Pressmatic Two Way Bib Cock With One End Pressmatic Outlet. Iv Health Faucet. V Paper Roll Holder For Western Style Toilet. Vi Stainless-Steel Waste Bin Arrangement & Mounting Bracket. Vii Lavatory Wi Ndow With Fixed Louvers And Sealed Glass Unit. Viii Ss Chequered Plate In Quadrant Form For Doorways. Ix T Oilet Ceiling With Acp Sheet. 4. Supply & Fitment Of I Vinyl Stickering On Panels Inside Lavatory Area And Door Way Gangway. Ii Wall Mounted Liquid Soap Dispenser. Iii Mirror Holder. Iv Lavatory Door Complete Right Han D & Left Hand. V Roof Ceiling In Doorway And Gangway. Vi Wash Basin Outside For Upgradation Of Toilet. Vii Frp/Ss Water Catchment Stand & Bowl. Viii Bib Cock With Wall Flange. Material Size & Spec. As Per Annexure . Warranty Period: 30 Months After The Date Of Delivery
Supply of Jumper Cable Support Link Assembly Stainless Steel As Per Drawing No. Lwscwac/Eog-7-1- 006/Col I, Alt-A. Packing Instruction : Spi220 Warranty Period: 30 Months After The Date Of Delivery
Provision Of Conversion Of Emu Coaches To Stainless Steel Equipment 1 Set Consisting Of I Ss Flooring Of Emu Motor Coaches 50 Nos., Ii Ss Grip Handle & Ss Luggge Rake 50 Nos., Iii Stainless Steel Seaters 50 Nos. At Kpa Workshop Within A Period Of 01 One Year
Supply of Set Of Stainless-Steel Volumetric Grease Container With Lid And Handle. 1 Set Containing 01 No. O F Each Item 1 Capacity: 2.250 Kgs Size: Od 170 Mm, Id 166 Mm, Height 130 Mm., Thickness 2Mm. 2 Capacity: 1.750 Kgs. Size: Od 162 Mm, Id 158 Mm., Height 120 Mm., Thickness 2 Mm. Warranty Period: 30 Months After The Date Of Delivery
Supply of Stainless Steel Seamless Pipe 22 Mm Od X 2 Mm Thick As Per Spec Astm A269 G Rade :Tp304 To Icf/Md/Spec-166 Warranty Period: 48 Months After The Date Of Delivery
Supply of Stainless Steel Ferrule Fitting Male Stud Connector To Size And Design As Per The Ermeto Order Code Ge22lr3/4Kegcf And Material As Per Following: Body And Nut Shall Be Of Stainless Steel To Spec Astm A479 Tp 304 Bar Stock And Astm A182 F 304 Forgings. The Ferrule Shall Be Of Stainless Steel To Spec Astm A276 Tp 316..
Supply of Gauge Adaptor, Stainless Steel, Suitable For 3000 Bars Crimpwell Make Hydraulic Pinion Extractor. Make: Crimpwell, Part No: Cwpe 40Kga. Warranty Period: 30 Months After The Date Of Delivery
Supply of Hot Water Boiler Stainless Steel, 30 Ltrs Capacity, Operating Voltage 230 Volt Ac, 50 Hz As Per Rc F Spec. No. Edts-130, Rev-B, Corr-6 & Drg. No. Lw73204 Alt D. Warranty Period: 30 Months After The Date O F Delivery
Supply of Stainless Steel Hex. Head Screw M10x30 For Underslung Water Tank Wire Rope Fixing Arrange Ment A2-70 To Is:1367 Pt.14-84 Conforming To Is Specification Is: 1364 Pt.2-92, Ce, Iso 4017 And To Rcf Dra Wing No. Lihwss02, Item-19, Alt.- Nil. Warranty Period: 30 Months After The Date Of Delivery
Supply of Stainless Steel Air Reservoir 125 Ltrs Conforming To Icf Drawing No. Icf/Std-3-5-039, Alt.- F/Nil. Warranty Period: 30 Months After The Date Of Delivery
Supply Of Set Of Stainless Steel Hex. Head Screw Bolt M10x30 Mm With M10 Nylock Nut And Suitable Washer As Per Is Spec 1364A2-70. Warranty Period: 30 Months After The Date Of Delivery
Supply of S.S M8 X 65Mm Bolt With Nut And Plain Washer One And Spring Washer One Of Stainless Steel Is:1 367 Part 14 :1984 Of Grade A2. Warranty Period: 30 Months After The Date Of Delivery
Supply of Stainless Steel Hex Head Bolt Of Size M8x15mm Fully Threaded With 01 Flat Washer . Material : Stai Nless Steel Grade A2-70. Make Tvs/Unbrako Or Similar. Warranty Period: 30 Months After The Date Of Delive Ry
Supply of Hex Head Bolt M8x25 Stainless Steel, Grade-A2, Make-Tvs/Unbrako/Tuff/Dfl/Vif/Lps Or Si Milar Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Stainless Steel Fully Threaded Hex Head Boltss 304. Each Set Consist Of 1 Bolt Size: M1 0 X 50 Mm With One Nut, 02 Nos Plain Washer And One Spring Washer, Qty. 02 Set/Set. 2 Bolt Size: M12 X 45 Mm With One Nut, 02 Nos Plain Washer And One Spring Washer, Qty. 01 Set/Set. Bolt As Per Specification: Din 933, Property Class: A2-70, Material: Aisi 304. Hex Nut Specification: Din 934, Property Class: A2-70, Material: Aisi 304. Plain Washer Specification: Din 125, Iso 7089, Property Class: A2, Material: Aisi 304. Spring Washer Specification: Din 127, Is 3063, Property Class: A2, Material: Aisi 304. Warranty Period: 30 Months After The Date Of Delivery Hexagonal Socket Head Cap Screw, Size: M8 X 35 Mm, Thread Tolerance: Class 12.9, Is:1367, Material: High Tensile Steel, Thread Type: Full Thread Type, Conforming To Is: 2269. Warranty Period: 30 Mont Hs After The Date Of Delivery
Supply of Jumper Cable Support Link Assembly Stainless Steel To Drg No. Lwscwac/Eog-7-1-006/Co L 1, Alt.Nil And With Proper Bracket As Per Icf Drg. No. Aab15007 Note: Material Test Certificate To Be Provid Ed By The Firm. Warranty Period: 30 Months After The Date Of Delivery