Painting Of Psc Girders Bridges Steel/Secondary Components Handrailings, Tr, Ladders Etc. And Pathway Of Bridge No. 85 Top Surface Of Chequered Plate And Patch Painting Of Owg Girders In Jat-Svdk Section
Ukai Songhad- Jalgaon - Section. Rep. Of Corroded Steel Girders By Precast Rcc/Psc Slab At Br. No.292 Total 3 Spans In Connection With Sanctioned Works Of Churchgate -Jalgaon Section Total 11 Nos Bridges.
Replacement Of Existing Early Steel Girder Span 1 X 3.20 M Of Bridge No.32 At Km-327/5-6, Bridge No.47 At Km-337/6-7 On Bti-Fzr Section Under Aden-1/Fzr.
Replacement Of Existing Early Steel Girder Span 1 X 3.20 M Of Bridge No.32 At Km-327/5-6, Bridge No.47 At Km-337/6-7 On Bti-Fzr Section
Proposed Replacement Of Existing Steel Girders With Psc Slab For Br. No. 128 Up 1X 12.20M And Br.No.136 Up 1X 12.20M In Ers-Ktym-Kyj Section .
Signaling Work In Connection With 1 Ukai Songadh-Jalgaon Section- Replacement Of Stone Slab Bridges By Providing Box Culverts .Total 21 Nos 2Churchgate-Jalgaon Sec. Repl. Of Corroded Steel Girders By Precast Rcc/Psc Slab On Bridges Total Bridge 11 Nos. & Span 50Nos.
Kottavalasa- Koraput Doubling Project - Assembling And Launching Of Girder Components, Supply And Fixing Of Bearings, H-Beam Steel Sleepers On Major Bridge No.543 10X45.7M Owg Over Kolab River Between Koraput - Suku Stations On Kk Line
Replacement Of Steel Girder Of Bridge Of Br.No. 61-A 2X3.66M At Km 16/13-14 With Psc Slab Between Ngwn-Nmda On Sir-Dlpc Section Under Aden/Sir. Ii Strengthening Of Return Walls Of Bridge No. 322-A And Jacketing Of Piers Of Bridge No. 385 On Umb-Ldh Section Under Aden/Rpj.
Replacement Of Deck Plate Of 30.5M U/S Girders Of Bridge No. 409 Up 5X12.2+5X30.5Mg At Km- 310/31- 311/9 Bet. Sntd-Bje On Ada-Gmo Section Including Re-Spacing Of Steel Channel Sleepers And Shifting Of Ohe Masts From Girders To Piers For Bridge No 409 Up & 403 Up 2X6.1+2X12.2+1X18.3 At Km 306/1-5 Bet Sntd-Rui In Adra Div.
Transportation And Launching Of Steel Bridge Girders Plate Girder And Open Web Girder For Mula River Bridge No. 390/1 Near Rahuri Station And Ror Flyover At Km 503.103 Manmad Entry Arrangement. Supplying, Transportation, Fixing And Launching Of Bearing To Be Used In The Above Bridges In Connection With Daund - Manmad Doubling Project
Construction Of The Proposed Road Over Bridgerob Of Span 1 X 36 Mtr. Composite Girder + 1 X 24 Mtr Composite Girder At Railway Km. 462/13-15 In Lieu Of Lc No.203 Between Kur-Kxpr Stations. And 2 Construction Of The Proposed Road Over Bridgerob Of Span 1 X 54 Mtr Bow String Steel Girder At Railway Km. 489/9-11 In Lieu Of Lc No.225 Between Bsdp-Kapg Stations On Kur-Psa Main Line
Launching Of Railway Supplied New Steel Plate Girders And De-Launching Of Existing Old Corroded Steel Girders Of Br. No. 121 Dn 4X24.40M Pg Including Allied Works In Raigarh - Kotarlia Section
Hosapete-Kottur Section Proposed Construction Of Two Lane Road Over Bridge At Lc No.35 At Km.41/525, Between Hagaribommnhalli And Vyasa Colony Stations As 1X60 Clear Span Bowstring Steel Girder As Railway Span And 2X18.71M Psc Girder + Cc Blocks On Approches.
Balance Work Of Replacement Of Steel Girder Bridges 15 Bridges; Phase-Iii, Replacement Of Steel Girder With Rcc Slab At Br No-350Up Span-5X6.10M
Rehabilitation Of Different Steel Girder Bridges Through Replacing Structural Members Which Are Highly Perforated And Have Gone Substantial In Its Thickness Is Vg-Siob Section
Construction Of Railway Portion Of Two Lane Road Over Bridge 1 X 60.00M Bow String Arch Steel Girder At Km. 63/09 - 10 In Lieu Of Level Crossing No. 45 In Indore - Dewas Section, Between Barlai - Mangliyagaon Stations
Provision Of Side Pathway On Various Steel Girder Bridges Over
Metallizing Of Steel Bridge Girder Br. No. 2, 11, 18 In Hmh-Sdlp Sec., Br. No. 72 In Sog-Aph Sec. & Br. No. 8 In Hsr-Re Sec. Of Bkn Div, Br. No. 54, 81, 107, 122, 129 In Smr-Bldi Sec., Br. No. 35A In Smr-Bme Sec.Of Ju Div, Br.No. 40 In Jp-Swm Sec., Br.No. 152Dn In Re- Jp Sec.And Metallizing On Side Pathway Of Br. No. 6, 23, 73Dn, 77, 81, 138Dn, 152Up, 195Dn, 198Dn, 200Dn In Jp Div., Providing Drainage Pipes At 47 Nos. Major & Important Psc Bridges Of Jp Div. And Painting Of Steel Girders
Replacement Of Steel Girder With Psc Slab For Bridge No. 490 1X12.20M At Km 29/800-900 Between Rajanukunte And Dodballapur Stations Of Baiyappanahalli - Dharmavaram Section. Sw-Ii: Replacement Of Steel Girder With Psc Slabs Of Size Above 9.15M And Up To 12.20M Span Bridges For Bridge No. 448 At Km 8/398 Between Nayandahalli Nyh - Jnana Bharati Halt Gnb Stations Of Bengaluru - Mysuru Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.