Supply, Installation, Testing, Commissioning Of Earthing System For Ats Complex And Iatc Tower At Navi Mumbai Airport, Supply Of Copper Plate, Supply Of Pvc Pipe For Watering, Supply Of Salt, Supply Of Charcoal, Supply Of Hdpe Pipes, Supply Of Copper Strips, Supply Of Multi Strand Single Core Pvc Insulated Copper Cable, Supply And Installation Of Sub Equipotential Earth Bus Bar, Supply And Installation Of Main Equipotential Earth Bus Bar, Installation Job For Earth Pit Including Inspection Chamber, Installation And Laying Of Copper Strip For Earth Grid, Installation And Laying Of Copper Strip From Earth Grid To Building, Installation And Laying Of Copper Strip From Ups Panel Room At Ground Floor To All The Rooms In All The Floors Of The Building And Also To The Roof Area Of The Building
Annual Repair And Maintenance Of 320 Kld Sewerage Treatment Plant - Supply Of Bio Culture Of Reputed Firms For Waste Water Management To Reduce Bod Cod Tss As Per The Pcb Norms For Period Of 365 Days 6 Litres Per Day 2190 Ltrs, Supply Of Jeggery Use For Chemical Reaction In Stp To Reduce Bod Cod Tss As Per Pcb Norms For Period Of 365 Days 6 Kgs Per Day 2190 Kg, Supply Of Liquid Chlorine For Period Of 365 Days 6 Litres Per Day 2190 Ltr, Supply Of Decorticated Coil Fiber For Stp 1 Bag 30 Kg, Amc Of 02 Nos Sump Pump 3 Phase 04 Nos 05 Hp And 02 Nos 03 Hp Mono Block Motor 3 Phase Including All Minor Repairs Etc Complete, Operation And Preventive Maintenance Of Stp By One Operator In All Days In A Month, Sample Testing Of Treated Water From Any Nabl Accredited Lab For Following Parameters A Bod B Cod C Tss D Fecal Choliform E Ph, Repairing Of 01 Nos 5 Hp Sump Pump Installed At Stp One Time Repair, Repairing Rewinding And Bearing Of 05 Hp Monoblock Pump Installed At Stp One Time Repair, Repairing Bearing And Sealing Of 03 Hp Monoblock Pump Installed At Stp One Time Repair, Providing And Fixing Of 50 Mm Multi Port Valve For Stp Sludge Water Installed At Stp One Time Repair, Repairing Of Micro Processer Based Stp Panel Installed At Stp One Time Repair, Replacement Of Sprinklers Installed On Chambers For Smooth Functioning Of Stp
Supply, Installation, Testing, Commissioning Of 4 Sets Of Water Cooled Packaged Airconditioning Plants Of Capacity 16 Point 5 Or 17 Tr Tons Of Each, Modification In Existing Plenum Chamber, Minor Modification And Repair Of Return Air Chambers And False Ceiling, Electrical Work, Dismantling Of Old Ac Plant, Civil Works - Provision Of Foundation Blocks And Vibration Isolation, Civil Works - Provision Of False Ceiling, Civil Works - Provision Of Fresh Air Window And Stale Air Opening., Civil Works - Provision Of Heat Insulation And Under Deck Insulation, Civil Works - Provision Of Platform For Cooling Tower, Miscellaneous Civil Works, Provision Of Heavy Duty Flooring, Erection, Commissioning And Testing Of The Plant At Site, Provision Of Indicators For Filter Clogging And Condenser Clogging, Supply Of Accessories
Supply of Humidity Chamber For Shoe Testing Q3