Supply of N Testing And Commsioning Of Grahpic Monitor System, 55 Supply Installation Testing And Commisioning Of Graphic Monitor System Supply Installation Testing And Commisioning Of Graphic Monitor Structure Supply Installation Testing And Commisioning Of Graphic Monitor Controller Supply Installation Testing And Commisioning Of Multi Media And Content Management System Supply Installation Testing And Commisioning Of Graphic Monitor Processor Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Transmitters Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Recievers Supply Installation Testing And Commisioning Of Graphic Monitor Cables Supply Installation Testing And Commisioning Of Distribution Amplifier Supply Installation Testing And Commisioning Of Minor Electrical Works Supply Installation Testing And Commisioning Of Graphic Monitor Switcher Supply Installation Testing And Commisioning Of Touch Kiosq With Pre Feeded Information Grahpic Monitor System Content Complete With Programming And Integration Grahpic Monitor System Operations Of The Entire System For One Year
Supply, Installation, Testing, Commissioningof Rfid Technology For Library Management System To Central Librar, Hf Staff Station With Face Recognition, Security Antenna 6 Feet 2 Panel Security Gate With An Antenna On Top, Tag Station For Tagging Books In Library, Hf Kiosk With Face Recognition, Central Admin Console Software For Librarian And It Admin, Interface Software To Integrate With Existing Setup, Face Recognition Device, Rfid Handheld Reader, Anti Theft Sticker, Rfid Tag, Egate Software, Smart Shelves For Returns
Supply, Installation, Testing, Commissioning And 2 Years Annual Maintenance Contract Of Energy Management System Along With Mfm Meters And Other Hardware
Supply, Installation, Testing And Commissioning Of Cms Crew Management System Integrated With Thin Clint Touch Screen Led Monitor, Kiosk, Bio Metric Device And Breath Analyzer, Ups, Key Board, Mouse, Pen Drive, Web Cam And Their Assembly With 3 Years Warranty For All Equipments At Crew Lobbies Of Electrical Rso Delhi Division, Northern Railway As Per Cris Specification No. 2007/Cris/Ndls-Hq/Cms/ Project/ Rollout- Ii/0030/Pt-1 Date 27.12.2018 With Annex. A&B Or Latest Enclosed As Annexure. Tft Display 17 Or Higher Lcd/Led Monitor With Key Board Mouse, Thin Client 1.86 Ghz Or Higher, 4Gb Ram Or Higher, 16 Gb Flash, Cris Image, Pen Drive, Ups 1Kva With Other Accessories. Touch Monitor Panel Model No.- Agmatel India Pvt. Ltd. Rtl 173, Tayal Tech Tayal2019, Palas Software Pvt. Ltd. 170Pcum, Qtel Comtech Ltd. Pm17scap0 Or Equivalent.
Supply Installation Testing And Commisioning Of Graphic Monitor System, Supply Installation Testing And Commisioning Of Graphic Monitor Structure, Supply Installation Testing And Commisioning Of Graphic Monitor Controller, Supply Installation Testing And Commisioning Of Multi Media And Content Management System, Supply Installation Testing And Commisioning Of Graphic Monitor Processor, Supply Installation Testing And Commisioning Of Graphic Monitor Switcher, Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Transmitters, Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Recievers, Supply Installation Testing And Commisioning Of Minor Electrical Works, Supply Installation Testing And Commisioning Of Graphic Monitor Cables, Supply Installation Testing And Commisioning Of Ip Bullet Survellance System, Supply Installation Testing And Commisioning Of All In One Recording System, Supply Installation Testing And Commisioning Of 4K Encoder, Supply Installation Testing And Commisioning Of Intel Processor, Supply Installation Testing And Commisioning Of 3 Core Power Cable, Supply Installation Testing And Commisioning Of Utp Cable, Supply Installation Testing And Commisioning Of 3 Feet Patch Cord, Supply Installation Testing And Commisioning Of 7 Feet Patch Cord, Supply Installation Testing And Commisioning Of Pvc Conduit Pipe, Integration Of Already Installed Surveilliance System With Existing System, Supply Installation Testing And Commisioning Of 55 Inches Graphic Monitor, Supply Installation Testing And Commisioning Of 24 Port Stackable Switcher, Supply Installation Testing And Commisioning Of Cabling Work Along With Electrical Accessories, Supply Installation Testing And Commisioning Of 9U Rack, Supply Installation Testing And Commisioning Of Liu With Accessories, Supply Installation Testing And Commisioning Of Programming Of Entire System, Supply Installation Testing And Commisioning Of Sftwares For Survellance System, Operations Of The Entire System For One Year
Supply, Installation, Testing And Commissioning Of I Passive Components For Ict Network, Ii Visitor Management Solution, Iii Access Control System
Supply Installation Testing And Commisioning Of Graphic Monitor System, Supply Installation Testing And Commisioning Of Graphic Monitor Structure, Supply Installation Testing And Commisioning Of Graphic Monitor Controller, Supply Installation Testing And Commisioning Of Multi Media And Content Management System, Supply Installation Testing And Commisioning Of Graphic Monitor Processor, Supply Installation Testing And Commisioning Of High Performance Scaler Switcher, Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Transmitter, Supply Installation Testing And Commisioning Of Graphic Monitor Utp Based Reciever, Supply Installation Testing And Commisioning Of Minor Electrical Works, Supply Installation Testing And Commisioning Of Graphic Monitor Hdmi Cables, Supply Installation Testing And Commisioning Of L Band Active Digital Signal Splitter, Supply Installation Testing And Commisioning Of Modulator, Supply Installation Testing And Commisioning Of Long Range Digital Amplifiers, Supply Installation Testing And Commisioning Of Utp Based Hdmi Transmitter, Supply Installation Testing And Commisioning Of Utp Based Hdmi Reciever, Supply Installation Testing And Commisioning Of Armored Fiber Optic Cables, Supply Installation Testing And Commisioning Of Racks Along With Power Cables And Other Related Acccsories, Supply Installation Testing And Commisioning Of Digital Transmission Nodes, Supply Installation Testing And Commisioning Of Digital Encoders, Integration Of Entire System With Existing Live Broadcasting System, Operations Of The Entire System For One Year
Up Gradation Of Remote Monitoring And Management Of Locomotives And Trains Remmlot From Revision.0 2 To Revision 05 Of 43 Hhp Loco Including Charges For Providing Central Back Up Data Logging And Processing System During Warranty Period For 01 One Year And Also Including Up Gradation Of Mrm Card Version Of Remlot To 4G Gsm Dual Sim. Work Involves Supply, Fitting, Testing & Commissioning Of The System. Make: Medha Qty:43 Locos
Supply Price Tank Farm Management System Q3 Transportation As Per Mr 1821 Q3 Mandatory Spares As Per Mr 1821 Q3 Supervision Of Installation Testing Calibration And Commissioning As Per Mr 1821 Q3
Planning, Designing, Construction, Testing And Commissioning Of Commercial Building Of Rcc Framed Structure Basement 2 + Gf + 6 Floors+ Terrace “Pm Ekta Mall” At Pandri Haat Campus, Pandri, Raipurchhattisgarh Which Meet Green Building Norms And Obtain The Certification Of The Same By Incorporating Stipulated Specification Along With All Services Civil And E&M As Per Nbc- 2016/Cpwd/Cgpwd Specification, Including Site Survey, Soil Investigation, Provision Of Parking Planning And Design Of Required Services, Preparation Of Preliminary Architectural & Detailed Working Drawings, Structural Analysis & Design, Planning, Designing, Execution Of All Civil And E & M Services, Obtaining All Statutory Approvals Including Dismantling Of Existing Building, Cutting/Transplant Of Trees, Environment Clearance/Environment Impact Assessment Eia And Commencement Certificate From Local Body And Commissioning Of Services Etc. As Per Detailed Scope And Specifications For Civil And E & M Works Including Internal Water Supply & Sanitary Installations, Internal Electrical Installations And Fans, External Civil And Electrical Service Connections, Power Wiring, Telephone Conduiting And Wiring, Lightning Conductor System, Lifts, Escalators, Addressable Intelligent Fire Alarm System, Fire Fighting System With Wet Riser And Sprinkler System & Pressurized Mechanical Ventilation I/C Chiller, Illuminated Signage, Lan System, Ip Based Epabx System, Wifi System, Ip Based Cctv System, Façade Lighting, Façade Projection Mapping, Water Supply Pump Sets, Dewatering Pumps And Panels, Online Ups System With 30 Minutes Backup, Dg Set, Integrated Building Management System, Audio -Visual/Conference System, Auditorium, Solar Water Heating System, Compound And Street Lighting With Led, Stp, Horticulture Work Etc And Any Other Component Necessary For Completion, Making The Facilities Functional, Obtaining Fire Clearance, Water Connection, Electrical Connection And Lift From Authorities Concerned, Obtaining Occupancy Certificate/ Building Use Bu Permission From Local Body, Obtaining Green Certification, Preparation And Submission Of “As Built Drawings” And Handing Over Of The Building All Complete As Per Directions Of Engineer-In-Charge Including 1 Year Of Operation And Maintenance & 3 Years Of Defect Liability Period.
Selection Of Implementation Agency For Design, Development, Testing And Commissioning Of Open- Source Web-Based Project Management Information System Pmis For Simhastha Kumbh Mela 2028
Design, Development, Manufacture, Supply, Installation, Testing And Commissioning Of Three Phase Propulsion Equipments And Control System For Bg High Speed Hybrid Electric + Diesel Self Propelled Accident Relief Train Spart, As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev. Nil.. Traction Transformer For Hs-Spart With Required No Of Secondary Trac Tion Windings Along With Protection Equipment, Safety Chain Arrangement And Ht C Able With Protection Shield Including Termination Crimping Lugs, Cable Markers Wit H Heat Shrinkable Sleeves For Power And Control Cables, Mating Connectors, Equi Pment Mounting & Earthing Hardware And Accessories Including Auxiliary Machines Such As Oil Pump, Oil Cooling Blowers As Per Clause 4.3 Of Rdso Spec No. Rdso/Pe/Spe C/Emu/0196-2019 Rev-0 Along With Mounting Hardware 01 Set Per Basic Unit, As Per Drawin G: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instruction: Suitably Covered Wit H Biodegradable Transparent Polythene And Packed In Wooden Box.The Material Us Ed For Product Packaging Shall Be Eco-Friendly .Each Packing Shall Be Stenciled/La Beled Handle With Care, Consignee Name, Order No, Pls No, Description Of Item, Batc H No, Drg/Spec No, Qty, Firms Name, & Date Of Despatch Etc. Warranty Period: 30 Months Aft Er The Date Of Delivery Set Of Metal Oxide Gapless Lightning Arrestors For Hs-Spart 02 Nos. For 25 Kv Ac As Per Clause 4.4 Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196-2019 Rev.0. One Set Per Basic Unit., As Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Pac King Instruction: Suitably Covered With Biodegradable Transparent Polythene And Pack Ed In Wooden Box.The Material Used For Product Packaging Shall Be Eco-Friendly .E Ach Packing Shall Be Stenciled/Labeled Handle With Care, Consignee Name, Order No, Pls No, Description Of Item, Batch No, Drg/Spec No, Qty, Firms Name, & Date Of Despat Ch Etc. Warranty Period: 30 Months After The Date Of Delivery Current Transformer And Potential Transformer For 25 Kv Ac For Set Of Two Vcbs For Hsspart One Ct & Pt For Each Vcb As Per Clause 4.1.1 Ii & 4.3 Of Rdso Sp Ecification No. Rdso/Pe/Spec/Emu/0196-2019 Rev.001 Set Per Basic Unit, As Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instruction: Suitably Covered With Bio Degradable Transparent Polythene And Packed In Wooden Box.The Material Used Fo R Product Packaging Shall Be Eco-Friendly .Each Packing Shall Be Stenciled/Labeled Handle With Care, Consignee Name, Order No, Pls No, Description Of Item, Batch No, D Rg/Spec No, Qty, Firms Name, & Date Of Despatch Etc. Warranty Period: 30 Months After The Dat E Of Delivery Set Of Two Vcbs With Earthing Switch For Each Vcb For Traction Circuit Protection And Ht Cable Protection For Hs-Spart As Per Clause 4.27 Of Rdso Specific Ation No. Rdso/Pe/Spec/Emu/0196-2019 Rev.0. One Set Per Basic Unit., As Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instruction: Suitably Covered With Biode Gradable Transparent Polythene And Packed In Wooden Box.The Material Used For P Roduct Packaging Shall Be Eco-Friendly .Each Packing Shall Be Stenciled/Labeled Ha Ndle With Care, Consignee Name, Order No, Pls No, Description Of Item, Batch No, Dr G/Spec No, Qty, Firms Name, & Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery Igbt Based Pwm Traction Converter Set For Hs-Spart Including Dc Link Wit H 100 Hz Resonance Filter, Brake Chopper Resistor, Dc Link Earthing Switch, Pre-Cha Rging Resisters And Contactors And/Or Any Other Equipment Necessary To Reduce The Effect Of Other Harmonics On S&T Equipment Including Termination Crimping Lu Gs, Cable Markers With Heat Shrinkable Sleeves For Power And Control Cables, Mati Ng Connectors, Equipment Mounting, Earthing Hardware And Accessories Includin G Auxiliary Machines As Required As Per Clause 4.5 Of Rdso Specification No.Rdso/Pe/ Spec/Emu/0196-2009 Rev-0 And Auxiliary Machines As Required. 01 Set Per Basic Unit, A S Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instruction: Suitably Cov Ered With Biodegradable Transparent Polythene And Packed In Wooden Box.The Mat Erial Used For Product Packaging Shall Be Eco-Friendly .Each Packing Shall Be Sten Ciled/Labeled Handle With Care, Consignee Name, Order No, Pls No, Description Of It Em, Batch No, Drg/Spec No, Qty, Firms Name, & Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery Three-Phase Fully Suspended Asynchronous Induction Motors For Hs-Sp Art Compatible With Igbt Based Traction Converter Power Supply, With Coupling, Ge Ar Box Assembly, Sensors And Associated Equipment Including Termination Crimping Lugs, Cable Markers With Heat Shrinkable Sleeves For Power And Control Cables, M Ating Connectors, Equipment Mounting & Earthing Hardware & Accessories As Per C Lause 4.6 Of Rdso Spec No. Rdso/Pe/Spec/Emu/0196-2019 Rev.01 Set Consists Of One Tm & Accessories, As Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instru Ction: Suitably Covered With Biodegradable Transparent Polythene And Packed In Wo Oden Box.The Material Used For Product Packaging Shall Be Eco-Friendly .Each Pac King Shall Be Stenciled/Labeled Handle With Care, Consignee Name, Order No, Pls No, Description Of Item, Batch No, Drg/Spec No, Qty, Firms Name, & Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery Microprocessor Based Train Control And Management System For Hs-Spa Rt Tcms With Brake Interface Unit Including Fault Diagnosis And Display System In T He Driving Cab And Multiplexing System For Relevant Control & Other Signals As Pe R Clause 4.9 Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196-2019 Rev.0, Wheel Slip/Sli De Protection &Anti-Skid Controls As Per Clause 4.24 Of Rdso Specification No. Rdso/ Pe/Spec/Emu/0196-2019 Rev.0, Including Integration With Tcms Of Automatic Door Clos Ure And Brake System, As Per Clause 4.1.1 Xiii Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196- 2019 Rev.0. One Set Per Rake., As Per Drawing: As Per Rcf Specification No. Rcf-Md-Ps-2024-1, Rev-Nil, Packing Instruction: Suitably Covered With Biodegradable Transparent Polythene And Pa Cked In Wooden Box.The Material Used For Product Packaging Shall Be Eco-Friendly .Each Packing Shall Be Stenciled/Labeled Handle With Care, Consignee Name, Order N O, Pls No, Description Of Item, Batch No, Drg/Spec No, Qty, Firms Name, & Date Of Desp Atch Etc. Warranty Period: 30 Months After The Date Of Delivery
Selection Of Implementation Agency For Design, Development, Testing And Commissioning Of Open-Source Web-Based Project Management Information System Pmis For Simhastha Kumbh Mela 2028, Ujjain