Aaugmentation And Construction Of 8 Wheeler Tower Wagon Sheds In Place Of 4 Wheeler Tower Wagon Shed At Talbehat And Babina Trd Depot Of . Bprovision Of Porter Huts At 16 Stations
Construction Of New 08 Wheeler Tower Wagon Shed At Sirathu Station In The Section Of Asst.
Augmentation Of 4 Wheeler Tower Wagon Shed To 8 Wheeler Tower Wagon Shed At Samalpatti Station And Construction Of Erode Ohe Depot And Earth Filling Under Feeder Wire Near Salem Tss -Electrical Arrangements.
Alteration In Existing Kyoson Make Ei System In Connection With Tower Wagon Shed & Associated Signalling Work At Glpt Station
Construction Of Tower Wagon Shed At New Palghar Crossing Station And Integrated Maintenance Sub-Depot Imsd At New Gholvad Crossing Station Between Vaitarna-Sachin Section Under Jurisdiction Of Chief General Manager/North, Mumbai In Connection