Various Works Related To Maintenance Of Track And Track Deficiency Due To Doubling In Jrq- Mpf-Rnq, Gmx-Jgf-Slbn And Mxy-Dxn Sections In The Jurisdiction Of Sse/P.Way/Rnq Under Aden/Rnq
Appointment Of Authority Engineer For Providing Project Management Servicespms For Doubling Of Track Between Gooty And Pendekallu Stations Including Electrification And Signalling Works In Guntakal Division Of South Central Railway And Doubling Of Track Between Diguvametta And Nandyal Stations Excluding Tunnels Portion I.E., From Km 219.00 To 223.800 & Km 232.300 To 233.600 Including Electrification And Signalling Works
Supply And Stacking Of Track Ballast As Per Ir Specification, In Between Atarra-Chitrakoot In Connection With Doubling Project Of Kid-Mkp Section
Doubling Of Track Between Jokkate And Thokur - Supply Of Alumino Thermic Welding Portions For The Works
Doubling Of Track Between Trivandrum And Kanniyakumari -Earth Work In Forming Bank/Cutting Ch: 238600 To Ch: 249150, Construction Of New Rub No 109A Of Size 9000Mmx5000mm In Lieu Of Rob No 108 At Ch:245892, Extension Of Lus No.74A Of Size 5500Mmx4500mm Rcc Box At Ch:238725, Extension Of Minor Bridges, Platforms, Fob, Protective Works, Retaining Wall, Drain, Approach Road Works And Other Miscellaneous Works Between Pasa & & Nyy Stations.
Construction Organization: Engineering, Procurement And Construction Epc Contract Agreement For Doubling Of Track Between Parbhani To Parli Stations 58.06Kms Excluding Gangakhed Yard From Km 292.075 To Km 298.85 6.775 Km Including Electrification & Signaling Works In Connection With Parbhani -Parli Doubling Project Of South Central Railway In The State Of Maharashtra.
Construction Organisation- Guntakal Division- Gudur-Renigunta Doubling -Execution Of Earth Work, Extension Of Minor Bridges, Construction Of Platforms, Service Buildings, Extension Of Foot Over Bridge, Cover Over Platforms, Dismantling Of Existing Buildings, Track, Points &Crossings And Foot Over Bridge, Collection Of Ballast & Dumping, Transportation Of P.Way Materials, Laying &Linking Of Track, Assembling & Insertion Of Points &Crossings Under Line Block And Other Miscellaneous Works In Connection With Renigunta Yard Remodelling.
Construction Organisation - Secunderabad Division - Left Over Works Like Collection Of Details Including Soil Investigations, Geotechnical Investigations For Bridges By Drilling Bare Holes, Collecting Samples, Fixing Square Alignment Pillars, Circular Alignment Pillars, Triangular Alignment Pillars, Bench Mark Pillars, Boundary Pillars, Preparation Of Esps And All Other Connected Works In Connection With Fls For Doubling Of Track Between Dornakal Junction And Bhadrachalam Road Stations 54.65 Km
Doubling Of Track Between -Kumbalam : Proposed Earthwork, Extension Of Minor Bridges, Construction Of Passenger Platforms, Platform Shelters, Fobs, Protective Works, Manual Linking Of Track, Transportation Of P.Way Materials And Modification Of Level Crossing Etc. At Kumbalam Station Yard Between Junction Excl And Kumbalam Incl. Km:06/600-08/700
Doubling Of Track Between Salem And Omalur-Elimination Of Permanent Speed Restrictions In Magnesite Yard.
Scr Construction Organization - Engineering, Procurement And Construction Epc Contract For Doubling Of Track Between Valigonda Station Incl. And Kukkadam Station Excl. From Km 28.00 To Km 103.00 I.E., 75 Km Including Electrification & Signaling Works In Connection With -Bibinagar Doubling Project
Composite Works Civil& Electrical Involving Earthwork, Blanketing, P.Way Work, Construction Of Minor Bridges, Robs, Retaining Wall, Fob, Platform, Station Buildings, Service Buildings, Approach Road, Circulating Area, Drain, Supply And Spreading Of Ballast, Linking Of Track Including Dismantling Of P.Way Track And Transportation Of P.Way Materials And Other Ancillary Civil Engineering Work And Supply, Installation, Testing And Commissioning In Connection To Electrification With 2X25 Kv Ohe System And Electrical General Work And Removal /Modification Of Various Electrical Infrigements 11Kv /33Kv H.T. &L.T. Overhead Lines Coming Under Proposed Alignment Between Telo Including Yard Km 9.25 And Chandrapura Excluding Yard Km 16.920 Stations In Connection With Doubling Of Dhanbadchandrapura Section
Electrification Of Station, S&T, Orh & Ttm Rest Room Bldg. Including Fob, Rly. Staff Quarters, Covered, Uncovered Platform With Water Supply Arrangement & Modification Of Oh Rly. Track Crossing In Connection With Bhiwani Bnw - Dobh Bahali Dbhl Doubling
Electrification Of Station, S&T, Ttm Rest Room Bldg. Including Fob, Rly. Staff Quarters, Covered, Uncovered Platform With Water Supply Arrangement & Modification Of Oh Rly. Track Crossing In Connection With Manheru Mhu - Bawani Khera Bwk Doubling Of Bkn Div. Over N. W. Rly.
Composite Works Civil & Electrical Involving Earthwork, Blanketing, P.Way Work, Construction Of Minor Bridges, Rub, Major Bridge, Rob, Retaining Wall, Fob, Platform, Station Buildings, Service Buildings, Approach Road, Circulating Area, Drain, Supply And Spreading Of Ballast, Linking Of Track Including Dismantling Of P.Way Track And Transportation Of P.Way Materials And Other Ancillary Civil Engineering Work And Supply, Installation, Testing And Commissioning In Connection To Electrification With 2X25 Kv Ohe System And Electrical General Work And Removal /Modification Of Various Electrical Infringements 11 Kv H.T.& L.T. Overhead Lines Coming Under Proposed Alignment Between Dhanbad Excluding Yard Km 271.395 And Matari Excluding Yard Km 290.188, Stations In Connection With Doubling Of Dhanbad-Chandrapura Section
Scr Construction Organization: Engineering Procurement Construction Epc Contract In Connection With Doubling Of Track Between Basar Station Incl From Km 430.000 Ch: 430000 & Navipet Station To Km 446.900 Ch:446900 I.E. 16.90Km Including Electrification & Signaling Works In Connection With Mudkhed- Medchal Doubling Project
Construction Of Additional New Bridges In Recently Commissioned Doubling Line, Protection Works For High Embankment With Pitching, & Construction Of Curtain & Drop Wall At Various Bridges, Repair To Pitching, Construction Of Drains Between Up And Dn Lines At High Embankements, Provision For Disposal Of Surface Flow Between Tracks Including Construction Of Collecting Chambers Etc In Connection With Residual Miscellenous Work Of Doubling Of Fl- Gvmr Section Over
Maintenance Of Track Including Miscellaneous Permanent Way Work And Other Related Works In Connection With Maintenance Of New Doubling Track Between Mahuariya Mxy: Km 66.29 To Dudhi Nagar Dxn: Km78.31 12.02Km., Obra Obra Km137.89 To Papra Kund Ppkd: Km 144.24 6.35Km. Section Including Yards Total Length - 18.37Km In Connection With Ramna Singrauli Doubling Rail Line Project
Construction Of Approach Road From Station Building To Nh-37 Including Cover Drain, Retaining Wall, Open Drain Etc., Provision Of Yard Drainage, Shifting Of Existing Utilities And Other Miscellaneous Works As Well As Linking Of Bg Track With 60Kg/52Kg Single / Long Welded Panels In Main Line/Loop Line On Psc Sleeper As Per Instruction Of Railway. The Work Including Linking Of 1 In 12, 1 In 8½ And Derailing Switches On Psc Sleepers Fan Shaped Layout, Laying Of Sejs, In-Situ Glued Joint Etc., Dismantling Of Bg Track, Point & Crossings From Km. 173/8 Aza End To 4/7Ghy End 2.70 Km In Connection With Nbq- Glpt-Kyq Doubling Project.