Supply And Execution Of Rail Welds With Contractors Own Welding Materials, Labour Etc For Various Track Renewal Works Under Jurisdiction Of Den N Brc Re-Invitedr-1.
Execution Of Complete Track Renewalsecondary At Joranda Road Yard Under Ssep.Way Dhenkanal
Execution Of Complete Track Renewalsecondary At Budhapank Yard Under Ssep.Way Talcher
Miscellaneous P.Way Works Such As Shallow Screening, Lifting Of Track, Through Packing, Welding Of Rail Joints, Pre And Post Tamping Work, Over Hauling Of Lcs, Boxing And Profiling Of Ballast, Casual Renewal Of Rails & Sleepers And Other P.Way Related Works At Various Locations Under The Jurisdiction Of Ssep.Way/Dhenkanal
Supply Of 52 Kg -90 Uts Welding Portion In Connection With Various Track Renewal Works In Aden/Kkdi Sub Division Jurisdiction. Rdso Approved Agencies Only Have To Offer Their Rates
Proposed Collection And Supply Of 50Mm Machine Crushed Stone Ballast At Melakkonnakkulam Ballast Depot Including Loading Into Railway Wagons, Unloading And Spreading In Connection With Various Track Renewal Works In Senior Section Engineer / Permanent Way / Pudukkottai, Sivaganga & Mandapam Section.
Proposed Collection And Supply Of 50Mm Machine Crushed Stone Ballast At Vadamadura Ballast Depot Including Loading Into Railway Wagons, Unloading And Spreading In Connection With Various Track Renewal Works In Senior Section Engineer / Permanent Way /Dindigul & Palani Section.
Supply And Execution Of In Situ 60Kg/90Uts & R-260 Rail Joints With Contractors Own Welding Materials, Labour Etc For Various Track Renewal Works Under Jurisdiction Of Sr.Den South Brc.
Complete Track Renewalp Manually For 2.187 Tr Km Between Bqa-Kgp Section. 2 Complete Track Renewals Manually For 0.938 Tr Km Between Bqa-Kgp Section And 1.544 Tr Km Between Adra-Bqa Section In Adra Division 3 Through Rail Renewal P Manually From Km 243.972 To 246.018Up For 2.046 Tr Km Between Bqa-Adra Section 4 Renewal Of 15 Nos. Of Sej In Kgp-Bqa Section 5Ttrtfr-6 Set 1 In 8.5, Ttrtws+Wcmsc- 16 Sets 1 In 8.5 And Ttrtws+Wcmsc- 55 Sets 1 In 12 In Adra- Bqa And Bqa-Kgp Section
S&T Work In Connection With Track Renewal Works 1 Bilaspur Division - Ttrcs+Cmsc- 153 Sets, Ttrds - 26 Sets & Ttrtws+Wcmsc - 5 Sets 2 Bilaspur Div.- Ttr-Cs- 64Sets, Cmsc-2Sets, Cs+Cmsc-40Sets, Ds-72 Sets, Tws+Cmsc- 50Sets, Tws+Wcmsc-37 Sets, Fs+Tws+Wcmsc-20Sets&Fs+Cs+Cmsc-2Sets & Tbr-48Sets. 3 Bilaspur Division - Trrp - 67.789 Tkm. 4 Champa Jn. - Bilaspur Jn. - Trrp - 21.775 Tkm & Jharsuguda Jn. - Champa Jn. - Trrp -17.638 Tkm 5 Champa Jn. - Bilaspur Jn. - Ctrs/P - 5.419 Tkm & Champa Jn. -Jharsuguda Jn. - Ctrs/P - 4.131 Tkm. 6 Bi Laspur Division - Trrp - 60.645 Tkm, And 7 Ctrs - 39.729 Tkm.
Manufacturing And Supply Of Alumino Thermic Welding Portions Of 60Kg/90Uts Rails 1500 Nos. Joints, 60Kg/60Ei-R350 Ht Grade Rails 1200 Nos. And 52Kg/90Uts Rails 2000 Nos. As Approved By Rdso And Welding In-Situ With Single Shot Crucible As Per Ir Specification In Connection With Track Renewal And Maintenance Work In Kharagpur Division Under The Jurisdiction Of Sr.Densouth/Kgp. Total 4700 Joints
Design, Supply, Erection, Testing & Commissioning Of 25 Kv Ac Ohe Modification Work Inconnection With Renewal Of T/Outs After Dismantling & Track Structure Improvement Works And Replacement Of Signaling Gears At Bhul Station With Provision Of S&T Buildings & Other Allied Works On Jind-Panipat Section.
Execution Of P.Way Works Like Trrp, Ttr, Tfr, Tsrp, Trrs And Ctrs, Renewal Of Sej & Glued Joints And Other Track Work Under The Jurisdiction Of Assistant Divisional Engineer/Raigarh
Execution Of P.Way Works Like Trrp, Ttrcs+Cmsc+Ds, Tbr, Tfr, Tsrp, Trrs And Ctrs, Renewal Of Sej & Glued Joints And Other Track Work Under The Jurisdiction Of Assistant Divisional Engineer/Brajrajnagar
S&T Work In Connection With Track Renewal Works 1Bilaspur Div.- Ttrin Sets - Cs-29, Cmsc-7, Cs+Cmsc-14, Ds-40, Tws+Wcmsc-1, Fs+Tws+Wcmsc-3 & Fs+Cs+Cmsc-8, Tws-23& Tbrp&C-76 2 Bilaspur Division - Ttrcs+Cmsc - 153 Sets, Ttrds - 26 Sets & Ttrtws+Wcmsc - 5 Sets 3 Bilaspur Div.-Ttr-Cs-64Sets, Cmsc- 2Sets, Cs+Cmsc-40Sets, Ds-72 Sets, Tws+Cmsc-50Sets, Tws+Wcmsc-37 Sets, Fs+Tws+Wcmsc-20Sets&Fs+Cs+Cmsc-2Sets & Tbr-48Sets. 4 Bilaspur Division - Trrp - 67.789 Tkm. 5 Champa Jn. - Bilaspur Jn. - Trrp - 21.775 Tkm & Jharsuguda Jn. - Champa Jn. - Trrp - 17.638 Tkm 6Champa Jn. - Bilaspur Jn. - Ctrs/P - 5.419 Tkm & Champa Jn. - Jharsuguda Jn. - Ctrs/P - 4.131 Tkm. 7 Bilaspur Division - Trrp - 60.645 Tkm, And 8 Bilaspur Division - Ctrs - 39.729 Tkm. Under The Jurisdiction Of Sse/Sig/No.1/Bsp
Viramgam Section - Complete Track Renewal Ctrp - 26.042 Km
Track Renewal Work At Mtps Private Siding