Stringing Of Earth Continuity Conductor On Lt Overhead Lines, Making Of Earth Pits And Providing Earth Continuity By Gi Strips, At Various Places Inside The Mine At Dipka Expansion Project, In Order To Comply With Dgms Violation.
Supply of Cls Panel 60 A Mp Capacity Control And Distribution Panel Automatic With Three Source Supply S Ystem For Colour Light Signaling Confirming To Rdso Specification No: Ti/Spc/Psi/Cls/0020 And Rdso Drg No: Eti/Psi/035.2 With The Following Additional Requirements.1. The Power Wiring Shall Have Facility To Switch Both Pha Se And Neutral Of All The Three Sources Such That Only The Phase And Neutral Of The Sources Selector For The Time B Eing Auto/Manual Gets Either Of The Following Configuration A.Provision Shall Be Made To Change The Priority Of E Ach Source By The User Through A Selector Switch Or B. The Source Selector For The Time Being Shall Continue In Se Rvice Unit A Changeover Is Necessitated Due Failure Of Voltage Limit Violation Abnormal Fluctuation Of That Source. Make: Japs, Suntron, Systems & Services Pc Supreme. Warranty Period: 30 Months After The Date Of Delive Ry
Supply Of Analytics Based Real Time Speed Violation Detection System