Excavation Of 5, 00, 000 Te Old Fines From Different Old Dump Fines Of Kalta Iron Mine, Loading Of The Same By Crawler Mounted Hydraulic Excavator And Transportation By Tippers/Dumpers To The Different Approved Stock Pile Of Old Fines Separately At An Average Lead Distance Of 0.6 Km After Weighment By 60 Te Minimum Pitiless Weighbridge And Unloading Of The Said Materials & Levelling At Approved Designated Stock Pile As Per Detailed Scope Of Work Mentioned At Clause – 5.1 Of Special Conditions
Supply of Internal Handling Of Urea In Bagging Plant For The Year 2024 25, 514850 Filling Stitching And Loading Of Filled Urea Bags In Closed Wagons Or Open Wagons Or Trucks Filling Stitching Stacking And Re-Loading Of Filled Urea Bags In Closed Wagons Or Open Wagons Or Trucks Including Placement Or Pushing Of Wagons Delivery Of Empty Bags From Empty Bags Storage Area Cleaning And Reclamation Of Good Urea And Off Grade Urea From Storage System Ie Conveyor Pjd-101 To Pjd-103 Gear Boxes Motors Cleaning And Reclamation Of Good Urea And Off Grade Urea From Reclamation System Ie Conveyor Pjd-106 To Pjd-109 Gear Boxes Motors Scrapping Of Off Grade Urea From Silo Floor And Shifting Or Collecting At An Approved Location In Silo Including Floor Cleaning Or Sweeping Handling Of Off Grade Urea And Dissolving The Same In A Tank Provided In Urea Plant Counting And Weighment Of Sampled Bales Of Empty Bags Unloaded From Trucks And Assistance In Complete Sampling As Directed By Committee
Supply, Erection, Testing, Stamping, Commissioning Of 2 X 100 Mtweighbridges At Fly Ash Gate Location For Weighment Of Truckstransporting Ash From Ash Dyke Including All Civil Works, Amc, Spares Etc. For Tstps, Kaniha