Under Crif Under The Honorable Cm Announcement No.182/2021 Widening/strengthening Of Nandprayag To Ghat Bazarblock Motor Road Km 01 To Km 18.550 Into Intermediate Lane In Block- Nandanagar, Constituency Assembly- Tharali
Widening Of Cement Concrete Road From H.no.2-4-1532/1 To End Of The Lane And H.no.2-4-1531/2 To Existing Cc Road At Vikas Nagar Road No.16, Hanamkonda In Div.no.57
Widening Of Existing Single Lane To Intermediate Lane, Extension Of Cross Drainage Work, Providing And Laying Metalling/tarring, Side Drain And Parapets Etcetera In Between Km.39/180 To 46/0
Consultancy Services Consultancy Services For Preparation Of Dpr For Widening To 4 Lane Divided Carriageway Of Chhapra Rewaghat Muzaffarpur Section Of Nh-722 In The State Of Bihar
Widening And Strengthening To 4-lane Of Patna-masurhi (sh-01) Sampatchak Bazar To Parsa Bazar (nh 83 Old) Via Chipra And Badlachak From Km 0.00 To Km 6.80 For The Year 2023-24
Talegaon Industrial Area, Ph I. Widening Of Existing North And South Side Roads To Four Lane Road At Plot Of Ms. Hyundai At T.i.a. Ph
Widening And Up-Gradation Of Existing Carriageway Into 2-Lane With Ps Configuration From Reshi To Rhenock From Ch. 96.254 To Ch. 101.554 Along Nh-717A In The State Of Sikkim On Epc Mode 2Nd Call Nhidcl/Hq/Reshi-Rhenock/2025
Widening & Strengthening Of Badhada Thordi Rajula & Rajula Bypass & Hindorana Road K.m. 40/8 To 69/2 & K.m. 0/0 To 2/6 & K.m. 1/6 To 3/25 (existing 10.0m To Four Lane Widening Work)
Widening /asphalting Of One And A Half Lane Road From Km 01 To Km 18.550 Under The Construction Of One And Half Lane
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-7 Of Silchar- Churaibari Road In The State Of Assam On Ham Mode Length- 14.38 Km Nhidcl/Assam/Sil-Chu-7/247858
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-1 Of Silchar- Churaibari Road In The State Of Assam On Ham Mode Length- 15.97 Km Nhidcl/Assam/Sil-Chu-1/253127
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-1 Of Bilasipura- Guwahati Road In The State Of Assam On Ham Mode Length- 17.74 Km Nhidcl/Assam/Bil-Ghy-1/247143
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-5 Of Silchar- Churaibari Road In The State Of Assam On Ham Mode Length- 24.90 Km Nhidcl/Assam/Sil-Chu-5/247856
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-2 Of Bilasipura- Guwahati Road In The State Of Assam On Ham Mode Length- 26.82 Km Nhidcl/Assam/Bil-Ghy-2/253125
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-6 Of Silchar- Churaibari Road In The State Of Assam On Ham Mode Length- 18.80 Km Nhidcl/Assam/Sil-Chu-6/247857
Appointment Of Safety Consultant For Widening/Improvement To 4 Lane With Paved Shoulder For Package-4 Of Silchar- Churaibari Road In The State Of Assam On Ham Mode Length- 24.20Km Nhidcl/Assam/Sil-Chu-4/247854
Widening And Upgradation Of Road From 2 Lane With Ps To 4 Lane With Ps For Rectification Of Black Spot Id Pb 03 189 Of Series 2017 19 At Location Km 159.550 Pakho Kalan On Nh 703 In The State Of Punjab Including Utility Shifting And Excluding Gst
Widening And Improvements From Ml To Dual Two Lane Divided Carriageway With Paved Shoulder At Km 90/0-92/900 Of Thoppur- Mettur -bhavani -erode Road Sh-20 Including Construction Of Storm Water Drain And Construction Of Additional High Level Bridge
Abilitation Upgradation And Widening Of Akola To Mahan Section From Km 35.265 To Km 64.574 Length 29.309 Km Including Construction Of 4 Lane With Paved Shoulder Configuration Of Barshi Takli Bypass Length 3.160 Km On Nh161a The State Of Maharas
Consultancy Services For Preparation Of Detailed Project Report And Pre-Construction Activities In Respect Of Construction Of Greenfield Alignment/Wideningof Existing Carriageway To 2 Lane With Paved Shoulder Configuration Along With Mitigation Nhidcl/Hq/Uttarakhand/Dpr/ Bhimtal To Almora /2025