Dismantling And Shifting Of Ht/Lt Cables, Pump-07 Nos. Each Of 60 Cusec Capacity, H.T.Motors-06 Nos. Each 1 Of 704 H.P. & 01 No. 525 H.P., H.T. And L.T. Panels, Sluice & Reflex Valve-07 Nos., Hollow Globe Valve-07 Pairs, Barge No. 01 In 12 Compartment Full Size 23.5 X 12.9 Mtr. & Barge No. 02 In 04 Compartment Full Size 21.36 X 12.81 Mtr. And Pipeline No. 01 To 07 Average Length 527 Mtr. Of Dia 900 Mm And 41 Mtr. Length Of Dia 1500 Mm With Syphonic Bend, Suction Bends Etc. And Other Old Equipments Installed At Dalmau B Pump Canal Including All Labour And T&P Under Renovation Project Daundiya. Kheda
Cleaning Of Silt Deposited In The River Bed From Km 0.00 Village Musapur To Km 78.70 Bhith Sluice Village Naula Of Balan River And Cleaning Of Silt Deposited In The River Bed From Km 0.00 Near Harsinghpur Village And Construction Of Double Lane Bridge At 33 Different Points
For The Work Of Repair Of C.I. Sluice Valve Various Size For Water Supply Arrangemnt Of Pump House No. 5, 6 And Over Head Tank Of Bargi Nagar Colony.
Construction Of Protection Wall And Improvement To Rfb Of River Rushikulya Near Village Pakidi Drainage Sluice.
Protection To Drainage Sluice On Lfb Of River Rushikulya Near Village Jayapur.
Embankment Protection Jjpr-47/24-25 Protection To Oae From Nadigaon Sluice To Pangata Upto Gandhighat On Kochila Left Near Pangata Thakurani Temple
Restoration To Sluice Drain Jjpr-6/24-25 Restoration To Sluice Drain Near Bamadevpur On Kharsuan Left.
Embankment Protection Jjpr-46/24-25 Protection To Oae From Nadigaon Sluice To Pangata Upto Gandhighat On Kochila Left Near Kochilanahakani Temple.
Construction Of Bhuinpur Bali Sahi Sluice At Rd 12.732 Km Of Kani Kharasuan Right Embankment Aul-36 Of 2024-25 Construction Of Bhuinpur Bali Sahi Sluice At Rd 12.732 Km Of Kani Kharasuan Right Embankment
Restoration Sluice Jjpr-2/24-25 Restoration Olei Sluice Of Oae No 7 B On Khrasuan Left At Rd 5.793 Km
Restoration To Sluice Jjpr-17/24-25 Restoration To Chintasula Sluice Of Nuamahara Left Embankment At Rd 11.900 Km.
Embankment Protection Restoration To Telijuri Sluice In Ksdr Embankment
Sluice Gate At Khristian Para Cannal Near The Jamai Para Khal
Providing A Team/Crew For Carrying Out Sealing To Stop/Arrest Leakage From The Penstock Gate Of Unit No. 1 For Carrying Out The Annual Repair And Maintenance Of Unit No. 1 At Surge Shaft Of 3X42 Mw Larji Hep
Mtc. Of Differernt Sluice Gate And Shutter Of Different Embankment Under Kmc Area, Kailashahar During The Year 2024-25 Sh Maintenance Of Sluice Gate.
Ahp Unit 1 2 3 4 5 Esp Operation And Maintenance Of Pdfac System And Wet Sluice System Including Materials For The Collection Of 58000 Mt Fly Ash In Unit I To V From The Date Of Handing Over Of Site
Mtc Of Differernt Sluice Gate Of Katanala-Maguruli Embankment And Safrikandi Katanala Embankment Under Gournagar Rd Block During The Year 2024 25 Sh Maintenance Of Sluice Gate.
Mtc Of Differernt Sluice Gate And Shutter Of Different Embankment Under The Jurisdiction Of W.R. Sub Divisionn Ii Kailashahar During The Year 2024 25 Sh Maintenance Of Sluice Gate I Ii.
Mtc Of Differernt Sluice Gate And Shutter Of Different Embankment Under The Jurisdiction Of W.R. Sub Division Ii Kailashahar During The Year 2024-25/ Sh Maintenance Of Sluice Gate Ii Ii.
Fdr Maintenance Of Sluice Gate At Durgapur Of Kmc Ward No.15 During The Year 2024 25 Sh Construction Of Sluice Gate Wall And Wing Wall, Providing And Fixing Flap Shutter For Sluice Gate Etc