Excavation And Filing Work For East Side Of Cbd Pit, Ts 8 Periphery Road Excavation And Various Other Structures In Connection With Civil And Structural, Ug Piping Work For Unit Site, Gail Usar Pdh - Pp Project
Construction Of Fair Price Shop At Lukung Village - Excavation Earth Work Excavation Upto 12 Inch, Retaining Wall Providing And Laying Of Retaining Wall, Back Filling And Filling With Available Excavated Earth, Ppc Flooring Providing And Laying Concrete With 40Mm, Masonary Work In Super Structure Providing And Laying Cement Brick Masonry, Internal Plastering, External Plaster Providing And Applying, Putty And Base With Obd, Painting Providing And Applying Two Or More Coats, Roof Steel Structure With Gi Sheet, Flooring Cement Flooring With 1 4 Cement Sand Ratio With Smooth Finish, Doors Doors Of Size 7Ft X 3 Ft With Hardware, Windows Windows Of Size 5Ft X 4Ft With Accessories And Hardware, Electrical Fitting Providing And Fixing, Providing And Supply Tubelight, Curtain For Windows, False Ceiling Including Providing And Fixing, Development Of Stage, Iron Rack With Installation For Display, Toilet Hardware And Plumbing Work
Earth Work In Excavation Exceeding 30Cm In Depth 1.5 Mtr. In Width Or 10 Sq.M. On Plan By Mech/Manual Means Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 Mtr Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 Mtr. All Kinds Of Soil, Cleaning Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Sapling Of Girth Upto 30Cm. Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Upto A Distance Of 2Km Out Side The Periphery Of The Area Cleared By Your Own Vehicle. Providing And Laying In Position Plain Cement Concrete 1- 3 - 6 1 Cement - 3 Coarse - 6 Graded Stone Aggregates 20 Mm Nominal Size Excluding The Cost Of Centering, Shuttering In Foundation, Footings, And Bases Of Column As Per Specifications And Drawings And Direction Of Engineer In Charge, B Suspended Floors, Roofs, Landings, Balconies, Shelves Etc.
Supply Of Thermal Insulation, Metal False Ceiling, Epoxy Flooring, 75 Mm Height Epoxy Coving, Expansion Joint By Rasin And Hardener, Earth Work In Excavation, Pcc 1 4 8, Rcc 1 1 5 3, Mild Steel Tmt Bar Fe 500 D Or More, Demolishing Cement Concrete Work Manually Or Mechanical Means, Demolishing Brick Work Manually Or Mechanical Means, Structural Steel Work Riverted Bolted Or Welded Detail Specification As Per Annexure A, Synthetic Enamel Paint, Precoated Galvanised Iron Profile Sheet Point Five Mm Thick, Precoated Galvanised Steel Profile Sheet Point Five Mm Thick Gutter 600 Mm Over All Grith, Plinth Protection 50 Mm Cc 1 3 6 And 75 Mm Thick Lean Concrete Detail Specification As Per Annexure A, Dismantling Of Old Plaster Detail Specification As Per Annexure A, 12 Mm Thick Cement Plaster 1 Is To 4 Detail Specification As Per Annexure A, Removing Dry Or Oil Bound Distemper Detail Specification As Per Annexure A, Pointing Work Detail Specification As Per Annexure A, Acrylic Smooth Exterior Paint Old Work Detail Specification As Per Annexure A, White Cement Based Putty Detail Specification As Per Annexure A, Distempering With 1St Quality Acrylic Detail Specification As Per Annexure A, 150 Mm Rain Water Pvc Pipe Detail Specification As Per Annexure A, Aluminium Partition Fixed Portion Powder Coated Aluminium Detail Specification As Per Annexure A, Aluminium Door Window Powder Coated Aluminium Detail Specification As Per Annexure A, Manual Sliding Device With Rail And Wheel Detail Specification As Per Annexure A, Aluminium Door Fitting 200 Mm Long Door Handle Detail Specification As Per Annexure A, Godrej And Equivalent Lock Detail Specification As Per Annexure A, Aluminium Door Fitting Tower Bolt 300X10 Mm Detail Specification As Per Annexure A, Glazing 8 Mm Thick Plain Glass With Epdm Rubber Detail Specification As Per Annexure A, 12 Mm Thick Prelaminated Partical Board Detail Specification As Per Annexure A, Making Joint Free And Hole By Butyl Adhesive Tape Detail Specification As Per Annexure A, Led 36 Watts Input False Light Of 600 X600 Mm Light And Wiring Detail Specification As Per Annexure A, Fixing Acp Curtain Wall For Duct And False Ceiling With Base Frame Detail Specification As Per Annexure A, 50 Mm Thick Sandwich Puf Panel With Both Point Five Mm Thick Sheet Both,
Hiring Of Hydraulic Excavator For Leveling Of Ground, Excavation, Refilling At Aiims
Replacement Of Upper Side Damaged Porceline Insulator Of 33 Kv Vcb Pole Alstom Make At 132 Kv S/S Lalkuan, Repairing Of Sand Pit At 132 Kv S/S I.A. Rathi, 220 Kv S/S Pratap Vihar & Scada Work At 220 Kv S/S Pratap Vihar, Under Electricity Transmission Division-Ii
Annual Rate Contract For Garden In Development Work Excavation, Conveyance & Supplyong Of Farm Earth, River Soil, River Sand & River Kamp In Thaltej Ward Of North West Zone.
Annual Rate Contract For Garden In Development Work Excavation, Conveyance & Supplyong Of Farm Earth, River Soil, River Sand & River Kamp In Chandlodia & Ghatlodia Ward Of North West Zone.
Annual Rate Contract For Garden In Development Work Excavation, Conveyance & Supplyong Of Farm Earth, River Soil, River Sand & River Kamp In Bodakdev Ward Of North West Zone.
Excavation Desilting And Cleaning Of Katcha Pacca Drain Nallah Of Rajur Bhandewada Colliery Premises Under Ghonsa Sub Area.Note Note Maximum Labours Are Required For This Work Is 270 Nos.
Custom Bid For Services - Additional Excavation In Rock At Minus 370 Ft Level At Chikla Main Section Of Chikla Mine
Patch Work On Different Main Road Regaring Excavation For Drainage Line And Water Line Upgradation In Satyamnagar, Rabari Colony Area In Amraiwadi Ward Of East Zone.Arc
Patch Work On Different Main Road Regaring Excavation For Drainage Line And Water Line Upgradation In Rajpur & Gomtipur Area In Amraiwadi Ward Of East Zone.Arc
Clearing And Excavation, Conveyance & Supplying Good Earth Like Fertile Soil, River Kamp For Preparing Gardens, Plantations & Nursery Plants In East Zone.
Clearing And Excavation, Conveyance & Supplying Good Earth Like Fertile Soil, River Kamp For Preparing Gardens, Plantations & Nursery Plants In South Zone.
Clearing And Excavation, Conveyance & Supplying Good Earth Like Fertile Soil, River Kamp For Preparing Gardens, Plantations & Nursery Plants In Central Zone.
Clearing And Excavation, Conveyance & Supplying Good Earth Like Fertile Soil, River Kamp For Preparing Gardens, Plantations & Nursery Plants In North Zone.
Balance Work Of Aden Swm Section : Cleaning Of Manhole, Inspection Chambers, Sw Pipe Lines And Soak Pit In Sse/W/Swm Section For Two Year.
Excavation And Removal Of 3.00 Lakh Te. Slime/Tailings From Tailing Dam & Transporting The Same To Old Fines Stock Yard &Western Side Of Reclaimer At An Average Lead Distance Of 4.0 Km & 3.3 Km. Respectively And Unloading The Same By Mechanised Means At Kiriburu Iron Ore Mines.
Reuse Of Skull Scrap After Process. Loading, Transportation Of Unprocessed Scrap To Processing Site. Processing, Transportation Of Processed Skull Scrap To Foundry Scrap Pit. Weighment As Per Scope Of Work.