Provision Of False Ceiling And Aluminium Partition Work In Regional Centre For Geodesy Rcg At Academic Campus.
Providing And Fixing False Ceiling With Fully Perforated Gypsum Board Tiles In Admin, Pa To Ddg Engg & Ddo Rooms At Ddk, Sector-37 B Chandigarh
Providing And Fixing False Ceiling With Fully Perforated Gypsum Board Tiles In Admin, Pa To Ddg Engg & Ddo Rooms At Ddk, Sector-37 B
Repair/Maintenance Of Internal Wiring, Incl Sub Main Wiring, Ceiling Fan, Exhaust Fan, Wall Fans And Allied Works Of , Mh And Purkazi
Repair/ Replacement Of Roof Sheet, False Ceiling, Truss And Other Connected B/R Works In Domestic Area At Afs
Repair/ Replacement Of Joinery And Other Connected Works, Wall Paneling, False Ceiling, Roof Treatment And Certain B/R Works In Tech Area
Supplying And Fixing Of Db, Supplying And Fixing Of Mcb, Blanking Plate, Supplying And Fixing 2Way Db With Mcb, Supplying And Fixing 63 A 4 Pole Isolator, Supplying And Laying 3.5 Core 25 Sqmm Cable On Surface, Supplying And Laying 3.5 Core 25 Sqmm Cable In Duct, Supplying And Laying 3.5 Core 25 Sqmm Cable In Pipe, Supplying And Laying 3X4 Sqmm Cable On Tray, End Termination For 4X25 Sqmm Cable, End Termination For 3X4 Sqmm Cable, Supplying And Laying 4 Mm Copper Earth Wire, Supplying And Fixing 63 Mm Rigid Pvc Pipe, Supplying And Fixing 20 Mm Pvc Pipe, Supplying And Fixing 63 Mm Reinforced Pvc Pipe, Supplying And Fixing Outdoor Stand For 1.5 Tr Ac, Supplying And Fixing 20 Watt Led Fitting, Supplying And Fixing Gi Cable Tray 150 Mm X 50 Mm, Supplying And Fixing Gi Cable Tray 300 Mm X 50 Mm, Frame Work With 40Mmx40mmx5 Mm Ms Angle Iron, Frame Work With 40Mmx5 Mm Ms Flat, Fixing Of Gi Sheet, Fixing Of False Ceiling Board, Dismantling Of Gi Duct, Installation Of 1.5 Tr Ac, Supplying And Fixing Refrigerant Pipe, Supplying And Laying 3Core 2.5 Sqmm Chord Wire
Repair To Roof Covering, False Ceiling, Joinery, Plastering, Flooring, Plumbing, Sanitary Fittings And Connected Works In Mt Jl Wing, Cdo Wing, Cdo Offrs Mess
Repairs / Maintenance Of Internal Electrification Works At Zone-Ii, Zone-Iiii And Zone Vi And Repair / Maintenance Of Ceiling Fan/ Exhaust Fan Other Appliances And Allied Works At Lekhapani Under Ge Lekhapani
Construction Of Fair Price Shop At Lukung Village - Excavation Earth Work Excavation Upto 12 Inch, Retaining Wall Providing And Laying Of Retaining Wall, Back Filling And Filling With Available Excavated Earth, Ppc Flooring Providing And Laying Concrete With 40Mm, Masonary Work In Super Structure Providing And Laying Cement Brick Masonry, Internal Plastering, External Plaster Providing And Applying, Putty And Base With Obd, Painting Providing And Applying Two Or More Coats, Roof Steel Structure With Gi Sheet, Flooring Cement Flooring With 1 4 Cement Sand Ratio With Smooth Finish, Doors Doors Of Size 7Ft X 3 Ft With Hardware, Windows Windows Of Size 5Ft X 4Ft With Accessories And Hardware, Electrical Fitting Providing And Fixing, Providing And Supply Tubelight, Curtain For Windows, False Ceiling Including Providing And Fixing, Development Of Stage, Iron Rack With Installation For Display, Toilet Hardware And Plumbing Work
Supply, Installation, Testing, Commissioning Of 4 Sets Of Water Cooled Packaged Airconditioning Plants Of Capacity 16 Point 5 Or 17 Tr Tons Of Each, Modification In Existing Plenum Chamber, Minor Modification And Repair Of Return Air Chambers And False Ceiling, Electrical Work, Dismantling Of Old Ac Plant, Civil Works - Provision Of Foundation Blocks And Vibration Isolation, Civil Works - Provision Of False Ceiling, Civil Works - Provision Of Fresh Air Window And Stale Air Opening., Civil Works - Provision Of Heat Insulation And Under Deck Insulation, Civil Works - Provision Of Platform For Cooling Tower, Miscellaneous Civil Works, Provision Of Heavy Duty Flooring, Erection, Commissioning And Testing Of The Plant At Site, Provision Of Indicators For Filter Clogging And Condenser Clogging, Supply Of Accessories
Supply of False Ceiling Q3
Removal And Replacement Of 05 Aluminum Doors With Wooden Doors Of Admin And Atc Building, Refurbishing Of Technical Library In Aed/Ald, Replacement Renewal Of False Ceiling In Office Spaces Of Met Department Alongwith Provision Of Integrated Led Ligh
Refurbishment And Repairs Of Porta Cabin - Removal And Replacement Of Wooden Flooring, Removal And Replacement Of Carpet, Removal And Replacement Of Window Curtains, Removal And Replacement Of Ceiling Fans, Entrance Door Damage Repair, Repair Of Internal Wall Paneling, Repair Of False Ceiling Panelling, Removal And Replacement Of Manager Table, Removal And Replacement Of Side Table, Removal And Replacement Of Overhead File, Removal And Replacement Of Electric Panel, Removal And Replacement Of Electric Panels, Removal And Replacement Of External, Removal And Replacement Of Internal Led Tube, Removal And Replacement Of Led Lights, External Painting, Porta Cabin Roof Water Proofing By Applying, Replacement Of Door Closure, Porta Cabin Roof, Removal And Replacement, Removal And Replacement Of External Mcb, Supply Of Mid Back Revolving Chairs, Supply Of Matress For Bunk Bed, Supply And Installationremoval And Replacement Of Wooden Flooring, Removal And Replacement Of Carpet, Removal And Replacement Of Window Curtains, Removal And Replacement Of Ceiling Fans, Entrance Door Damage Repair, Repair Of Internal Wall Paneling, Repair Of False Ceiling Panelling, Removal And Replacement Of Manager Table, Removal And Replacement Of Side Table, Removal And Replacement Of Overhead File, Removal And Replacement Of Electric Panel, Removal And Replacement Of Electric Panels, Removal And Replacement Of External, Removal And Replacement Of Internal Led Tube, Removal And Replacement Of Led Lights, External Painting, Porta Cabin Roof Water Proofing By Applying, Replacement Of Door Closure, Porta Cabin Roof, Removal And Replacement, Removal And Replacement Of External Mcb, Supply Of Mid Back Revolving Chairs, Supply Of Matress For Bunk Bed, Supply And Installation
Supply Of Thermal Insulation, Metal False Ceiling, Epoxy Flooring, 75 Mm Height Epoxy Coving, Expansion Joint By Rasin And Hardener, Earth Work In Excavation, Pcc 1 4 8, Rcc 1 1 5 3, Mild Steel Tmt Bar Fe 500 D Or More, Demolishing Cement Concrete Work Manually Or Mechanical Means, Demolishing Brick Work Manually Or Mechanical Means, Structural Steel Work Riverted Bolted Or Welded Detail Specification As Per Annexure A, Synthetic Enamel Paint, Precoated Galvanised Iron Profile Sheet Point Five Mm Thick, Precoated Galvanised Steel Profile Sheet Point Five Mm Thick Gutter 600 Mm Over All Grith, Plinth Protection 50 Mm Cc 1 3 6 And 75 Mm Thick Lean Concrete Detail Specification As Per Annexure A, Dismantling Of Old Plaster Detail Specification As Per Annexure A, 12 Mm Thick Cement Plaster 1 Is To 4 Detail Specification As Per Annexure A, Removing Dry Or Oil Bound Distemper Detail Specification As Per Annexure A, Pointing Work Detail Specification As Per Annexure A, Acrylic Smooth Exterior Paint Old Work Detail Specification As Per Annexure A, White Cement Based Putty Detail Specification As Per Annexure A, Distempering With 1St Quality Acrylic Detail Specification As Per Annexure A, 150 Mm Rain Water Pvc Pipe Detail Specification As Per Annexure A, Aluminium Partition Fixed Portion Powder Coated Aluminium Detail Specification As Per Annexure A, Aluminium Door Window Powder Coated Aluminium Detail Specification As Per Annexure A, Manual Sliding Device With Rail And Wheel Detail Specification As Per Annexure A, Aluminium Door Fitting 200 Mm Long Door Handle Detail Specification As Per Annexure A, Godrej And Equivalent Lock Detail Specification As Per Annexure A, Aluminium Door Fitting Tower Bolt 300X10 Mm Detail Specification As Per Annexure A, Glazing 8 Mm Thick Plain Glass With Epdm Rubber Detail Specification As Per Annexure A, 12 Mm Thick Prelaminated Partical Board Detail Specification As Per Annexure A, Making Joint Free And Hole By Butyl Adhesive Tape Detail Specification As Per Annexure A, Led 36 Watts Input False Light Of 600 X600 Mm Light And Wiring Detail Specification As Per Annexure A, Fixing Acp Curtain Wall For Duct And False Ceiling With Base Frame Detail Specification As Per Annexure A, 50 Mm Thick Sandwich Puf Panel With Both Point Five Mm Thick Sheet Both,
Petty Repair And Day To Day Maintenance Of Plumbing, Sanitary Items, Wooden/Steel Joinery Works, Bath Fittings, False Ceiling, Tilling Works And Other B/R Works For Md Accn Of Zone 8 And 9 Under Ge N
Petty Repair And Day To Day Maintenance Of Plumbing, Sanitary Items, Wooden/Steel Joinery Works, Bath Fittings, False Ceiling, Tilling Works And Other B/R Works For Md Accn Of Zone 7 And 7A Under Ge N
Day To Day Maintenance Of Plumbing, Sanitary Items, Bath Fittings, False Ceiling, Tilling Works Joinery Works And Other B/R Works At Otm Accn Under Gen
Repair/Maintenance Of Fans Ceiling, Wall Mounted, Exhaust, Geyser Alongwith Connected E/M Works At Af Stn