Fiber Bragg Grating Based Optic Sensors, Interrogators And Data Acquisition System For Long Term Monitoring Of A Pre-Stressed Concrete Box Girder Bridge
Construction Of 25.0 Mtr. Span Steel Girder Incl. Approach Road On Champal Nallah Fagari Temple Ser To Dhandal Via Got. Hr. Secondary School Jaganoo Under Nabard Ridf-Xxix
Construction Of Railway Portion 134 Meter Including Foundation, Substructure And Superstructure Bow String Steel Girder In All Respect Construction Of 04 Lane Rail Over Bridge On Gt Road To Airport Road Near Subedarganj Railway Station In District
Replacement Old Rcc Girder With Psc Slab At Bridge No: 29 & 86 Under The Jurisdiction Of Aden/C/Kota.
Provision Of Side Pathway On Various Girder Bridges Between Khurda Road -Rajathgarh Section
Installation Of Led Board, Wooden Ladder And Girder At Meshwo Reservoir Scheme
Formation Cutting, C/O Passing Places, R/Wall, Missing C.D. Work, Gsb, Wbm-Ii, Wbm-Iii, Tarring Work, Cc Pavement, Side Drain, Parapetsand Road Side Furniture Including Routine Maintenance For Five Years After Completion Of Construction Work. Under Construction Of Keru Kelan To Kotlu Road Km 0/000 To 1/550 Including 40.00 Mtr Span Rcc Box Girder Bridge Over Mandh Khad At Rd 1/125
C/O 40.00 Mtr Span Rcc Box Girder Bridge Over Mandh Khad At Rd 1/125 Under Nabard Ridf-Xxix Construction Of Keru Kelan To Kotlu Road Km 0/000 To 1/550 Including 40.00 Mtr Span Rcc Box Girder Bridge Over Mandh Khad At Rd 1/125
Supply, Installation, Erection & Commissioning Of Single Girder Free Standing Jib Pillar Crane Of Capacity 5T, Clear Length Of Boom Approx. 5Mtr., Height Of Lift 4Mtr. Or Above, 6X36 Steel Core Rope Of Reputed Make, Squirrel Cage Induction Motor Of Reputed Make, Electromagnetic Disc Brake, 415V50hz Power Supply, Mcb & Contactor Operated Panel With Pendant Push Button Type. Make Gec/Reva/Equivalent. Warranty Period: 30 Months After The Date Of Delivery
Fabrication Transportation Erection And Launching Of Bow String Girder Of 56.00 M Span At 02 Lane Rob Lc No 23 Of Jaitipur Ajgain Mohaan Marg In District
Bina-Dholpur: Repair And Metalizing To Floor System Of Important Girder Br. No. 1006/1 Up & Dn, 1251/1 Up, 1258/1 Up, 1267/1 Up, 1231/2 Up & Dn, 1282/2 Up.
A Virangana Laxmibai-Manikpur: Repair And Metalizing To Floor System Of Important Girder Bridges No. 1141/1, 1316/1 And Other Steel Structures. B Virangna Laxmibai-Kanpur: Repair And Metalizing To Floor System Of Important Triangulated Girder Bridge No. 1275/1 Dn And Other Steel Structure.
Open E-Tender For Balance Work Of Changing Of Top And Bottom Main Angle Of Rail Barrier, Cross Girder And Other Worn Out Member Of Bridge 383D/Up, Bridge No. 340/A And Bridge No. 41 Of Malda Division.
Construction Of Proposed Rub Size 1 X 4.50 X 2.50 M Rcc Box By Relieving & Pushing Method Near Lc No. 132 In Abu Road Yard & By Relieving Girder Near Lc No. 88 In Jawaibandh Yard On Md-Pnu Section
Balance Work For Rebuilding Of Bridge No.53Dn By Replacing 4X18.3M & 2X9.45M Girder And Pier From Single Span Open Web Girder Under The Jurisdiction Of Assistant Divisional Engineer/Manendragarh.
Recoupment Of Monsoon Reserve Shallow Type Service Span Length 20Feet 02 No, 30Feet 02 No, 40 Feet 01 No & 60 Feet 01 No., Cc Crib 2X2x6 500Nos, Cc Crib 2X2x2 500 Nos To Meet Emergency During Monsoon Under Bridge Line Lucknow Unit, Provision Of Lifting Arrangement Of Box Girders For Repair & Maintenance Of Elastomeric Bearings And Provision Of Inspection Arrangements In Br No. 163 30X30.5M Psc Box Girder Over River Ganga Between Pfm- Prg Stations Of Lucknow Division & Replacement Of Temporary Staging Interchangable Type For Use In Emergency Under Bridge Line
Prposed Replacement Of Pipe Bridge At Br.No 33A At Km.96/900-97/000 And Bridge No:41 At Km.104/900-105/000 Between Bagalkot Bgk Jadramakunti Jrjt Stations By Cut And Cover Rh Girder Method.
Strengthening Of Super Structure Of Bridges By Replacing Of Slab/Girder To Make Them Fit For 25T-2008 Loading On Re-Hsr Section Western Corridor Under Aden/Bhiwani.
Sc-Dhne Section: Replacement Of Existing Steel Girders With Psc Slab On Br No. 14-1X12.20M At Km 5/700-800 Up & Dn Lines, Br No. 26-2X 12.20M At Km 8/800- 900 Up & Dn Lines, Br No. 78-3X11.89M At Km 29/900-30/0, Br No. 115-1X11.60M At Km 51/600-700, Br No. 406A-1X12.20 At Km 186/0-100-Total 11 Spans, 2 Mjf-Mly Sl- Ctrp-2.930 Tkm & Mjf Byepass Sl-Ctrp-0.800 Tkm, 3 Mue-Sc Up-Ctrp- 13.600 Tkm, 4 Sc-Dhne Up-Ctrp-3.350 Tkm, 5 Dhne Dn& Sl-Ctrp-28.898 Tkm, 6 Mue-Sc Up& Dn-Trrp-25.000 Tkm & Mue-Sc Sl-Trrp-21.500 Tkm, 7 Mue-Sc Sl-Trrp-64.000 Tkm, 8 Mue-Sc Sl-Trrp-15.000 Tkm, 9 Sc-Dhne- Ctrs-5.350 Tkm & Trrs-2.020 Tkm, 10 Mue-Sc Loop Lines-Ctrs-15.600 Tkm & Trrs-5.500 Tkm, 11 Mue-Sc-Ttr Fs+Tws+ Wcmsc-6 Sets 1:12, 12 Sc-Dhne- Ttr Fs+ Tws+Wcmsc-12 Sets 1:12, 13 Mue-Sc-Ttr Fs+ Tws+Wcmsc-22 Sets 1:12-11 Sets & 1:8.5-11 Sets & Ttr Cs+Cmsc-1 Set Rails 1:8.5, 14 Sc-Dhne Up & Dn/ Sl-Ttr Fs+Tws+ Wcmsc-11 Sets & Ttr Fs+Cs+Cmsc-1 Set, 15 Sc-Dhne Sl-Tftr-6.500 Tkm, 16 Sc-Dhne Section: Gwd-Extension Of Pfs And Cops With Improvements To Pf Surface & Wall, 17 Sc-Mue Section: Nzb-Improvements To Circulating Area And 18 Carrying Of Signalling Circuit Alteration & Releasing Of Lc Gate Related Works In Connection With The Work Of Proposed Construction Of Rob At 1X23.5 Mtrs. Clear Composite Girder In Lieu Of Lc Gate No. 73 At Km 138/03-04 Between Dkc-Kqq Stations In Sc-Dhne Section-S&T Arrangements.
Bina- Rehabilitation Of Girder Bridge No. 950/1 Dn And Middle Line By Rcc Twin Box Span 1/12.20M Total Span