Flood Protection Work Bwo Raising Of Lining Wall On R/S Of Litter Nallah At Zargar Mohalla Handwara
Cement Concrete . Lining To Tarana Minor From Rd 0.300km. To 0.500km.
Anti-Erosion Work Bwo Construction Of Lining Wall On R/S Of Vij Nallah D/S Culvert At Vilgam Near H/O Ab. Hamid Shah And Others
Construction Between Km 4.400 To 4.860 Of Mahadev Minor And Protective Lining And Concrete Works On The Constructed Drainage Siphons
Providing And Applying Premixed Refractory Lining As Per Approved Design, Drawings, And Specifications, Including All Necessary Mixing, Ramming, Pressing, And Baking Within A Hollow Metallic Outer Casing Using The Contractors Own Materials, Fuels, Gases, Electricity, And Other Required Resources, Ensuring Completion To The Specified Quality Standards Assuring Execution Of Work In Supervision Of Railway Official Within The Campus Of Northern Railway Facility Center Located Within Bridge Workshop/Nr/Charbagh/Lucknow.
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling of structurals tanks machineries Equipments at all levels and at either of the plants 25 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Structural fabrication and thereafter painting of structurals at either of the plants 50 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant /system /Equipments (Version 2) - Industry Unit; Erection of structurals equipments at all levels and at either of the plants 50 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Pipe line fabrication modification and replacement with oldnew pipe upto 380 NB at either of the plants 200 meter as per scope of work; as per scope of wo.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Rubber lining works The rubber lining is to be done by cold vulcanization work and lined with new rubber sheet old conveyor belt 50 square meter as per s.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Supplying providing and fixing of GI Roof sheet work 250 square meter as per scope of work; as per scope of work