Working Survey, Soil Investigation, Design & Construction, Testing & Commissioning Of Elevated Storage Reservoir Esr And Ground Water Storage Reservoir Gsr, Providing, Supplying, Lowering, Laying, Jointing Rising Main And Gravity Main Pipeline, Pumping Machinery, Pump Room, House Connection In Gamtal Part, Renovation Work Of 04-Mld Wtp, Head Work Development, Pumping Machinery Work, Electrical Work With All Allied Work With 05-Year Operation And Maintenance Including 03-Year Defect Liability Period Of Mandvi Water Supply Scheme, Designing And Providing, Supplying, Lowering, Laying, Jointing R.C.C. Np-3 Pipe For Sewer Collecting System, Road Resurfacing, House Connection, Rising Main, Pumping Station With Screen Chamber & Pumping Machinery With Pump Room With 02-Year Operation And Maintenance Including 03-Year Defect Liability Period Of Under Ground Drainage Project Of Mandvi Nagarpalika
Construction Of 250 Cum Capacity Rcc Ohr....Pipe Connection And Cost Of Pipes, Specials With Necessary Soil Investigation With Foundation Design As Per Soil Test Report For Gopinathpur Piped Ws
Supply Of L3 Distribution Switch, 24 Port Gigabit Switch, Network Access Control For 100 Users, Network Management Software For Centralized Management, Server For Nms With Intel Xeon Processor And 32Gb Ecc Ram, 55 Inch Display For Network Management Software, Workstation For Nms Monitoring, 10G Sfp Single Mode Sfp Transceiver Module, 12 Core Single Mode Armoured Optical Fibre Cable, 24 Port Fully Loaded Liu With Standard Accessories, 3 Mtr. Single Mode Sc-Lc Ofc Patch Cord, 9U 600 X 600 Rack With Standard Accessories, 50Mm Hdpe For Laying Of Ofc, 50Mm Gi Conduit For Laying Of Ofc, 50Mm Pvc Conduit For Indoor Laying Of Cables, Digging And Refilling Of Hard And Soft Soil, Concrete, Bricks Etc As Required And Making Good The Same As Per Site Condition, 60 Mtr, Laying Of High- Density Polyethylene Pipe Underground As Required And Making Good The Same As Per Site Condition, 100 Mtr, Laying Of Gi Conduit Underground As Required And Making Good The Same As Per Site Condition, 20 Mtr, Laying, Fixing Of Pvc Conduit Onor Above Of False Ceiling Or Fixing On The Wall Including Fixing Of Suitable Saddle, Screws Etc. As Required As Per Site Conditions, 600 Mtr, Laying Of Optical Fibre Cable Through Hdpe, Pvc Conduit, Gi Conduit Complete As Required, 700 Mtr, Splicing Of Optical Fibre Cable Complete As Required, 240 Nos, Mounting And Fixing Of Liu Complete As Required, 10 Nos, Mounting, Fixing And Dressing Of Wall Mount Rack Complete As Required, 9 Nos, Mounting, Fixing, Installation And Configuration Of All Types Of Server And Workstation Complete As Required, 2 Nos, Mounting, Fixing, Installation And Configuration Of All Types Of Switches Complete As Required, 22 Nos, Installation And Configuration Of Network Access Control As Required, 1 No, Installation And Configuration Of Network Management Software As Required, 1 No, Testing, Commissioning, Certification, Providing 3 Sets Of Completion Diagram, Documentation Of Entire Project And Training To Users With 5 Year Service Warranty Complete As Required
Topographical Survey Of Roads Existing As Well As New Including Preparation Of Detailed Project Reports For Construction Upgradation Of Existing Roads And New Roads In The Territorial Jurisdiction Of R And B Division Lolab
Construction Of Heliport At Jankour Haar Tehsil Sh Providing Pre-Feasibility Study Report Conducting Of Site Survey Topographical Survey Obstacte Limitation Survey Ols Soil Testing
Construction Of Housing Colony At Basal Sh Soil Investigation Rock Testing Slope Tability Analysis Hydrological Studies Geotechnical Laboratory Test Thereof For Construction Of Proposed Block No 26 27 28 And 29 Specialized Job Thereof
Carrying Out Sub Soil Investigation Ssi, For Protective Works For Stabilization Of Land At Opposite To Cgda Guest House On Cgdhq-14, Port Blair At South Andman Under 46 Britf Project Pushpak
Appointment Of Sub Consultant For Carrying Out Geotechnical Investigation For The Work Preparation Of Tefr For Setting Up Of A Major Port Cum Shipbuilding Cum Repair Cluster In Duggirajupatnam In The State Of Andhra Pradesh
Design And Construction Of 2 Nos Type-V Married Accommodation Including Surveys/Soil Investigation, Internal/External Services At Hq Cep Chetak Location Under 101 Rcc/49 Brtf/Cep Chetak
Sub Soil Investigation, Design, Drg And Constr Of 80 M Span Major Pmt Shere Thapa Bridge Over Ismi-Siko Nallah Including Approach Roads At Km 0.630 On Road Tcc-Maza Through Epc Mode Under 128 Rcc / 23 Brtf/Project Arunank In Arunachal Pradesh.
Consultancy Services Structural/ Architectural/Geo Tech Investigation/ Other For Construction Of 1X30 Meter Span Plate Girder Bridge At Doabgah On Nallah Vibal At Rafiabad Incl.. Soil Investigation.
Supply of Soil Investigation And Structural And Architectural Drawing For Construction Of Kv Lab At Kv School
Expression Of Interest For Consulting Agency For Preparation Of Dprs On The Approved Category Wise Remuneration Using App/Manually As Per Requirement For Various Programs Of Rural Works Department, Bihar/Nrida Including Road Survey With Creation Of Kml File, Traffic Survey With Automatic Traffic Counter And Classifier Atcc As Per Requirement, Soil Investigation, Hydrological Survey And Its Vetting.
Invited From Approved And Eligible Consulting Agency For Preparation Of Dprs Using App, Manually For Various Programs Of Rural Works Department Including Road Survey With Creation Of Kml File, Traffic Survey With Automatic Traffic Counter And Classifier, Soil Investigation, Hydrological Survey And Its Vetting
250 Cum Ohr Intze Type With Pile Foundation, Rising Main, Laying Distribution Pipe Line, Pump House, Boundary Wall, Soil Investigation And Accommodate Fhtc 460 Nos Under Jjm With Allied Work For Ita Baria- Pwss In Bhagwanpur Block
Selection Of Laboratories For Testing Of Productsmaterial - Soil; Topographical Survey And Soil Investigation; Number; Civil
Custom Bid For Services - Soil Investigation For Provision Of Quarter Guard And Kote At Rvc Centre College At Meerut
Preparation Of Gads, Detailed Design And Drawing Including Geotechnical Investigation For Construction Of 04 Four Robs In Connection With Elimination Of Level Crossing Gate No. 94 Km 145/00-01, 96 Km 147/19-21, 105 Km 156/15-17 & 106 Km 158/15-17 On Dfc Route Between Mankar And Rajbandh Station Of Asansol Division Under Gati Shakti Unit
Soil Investigation, Construction Of Over Head Reservoir Of Capacity 350 Cumzone-I And 300 Cumzone-Ii Related To Water Supply Scheme At Sahapur And Its Adjoining Mouzas...Including Supply Of All Labour, Materials
Conducting Final Location Survey, Traffic Survey Submission Of Comprehensive Dpr For All Civil, Electrical And S&T Work Preparation Of Detail Estimate Alongwith Alignment Plan, Yard Plan, Drawing For Minor Bridges, Major Bridges, Rob/Rub, Fob, Level Crossing Drawings, Hydrological & Geotechnical Investigation And All Other Ancillary Works, Preparation & Submission Of Epc Tender Document For All Works Including Eletrical, Trd And S&T For : A Pirpainti By-Pass Line Connecting Sahibganj-Bhagalpur Line With Godda-Pirpainti Line: 10.00 Km Approx, B Bonidanga -Barharwa 3Rd. Line & 4Rth. Line: 4.73 Km Approx, C Bhagalpur - Jamalpur 4Th Line: 52.99 Km Approx. & D Jamalpur - Kiul 3Rd. Line & 4Rth. Line: 45.05 Km Approx.