Annual Maintenance Services For Water Purification And Conditioning System Version 2 - Potable Water Purification System Reverse Osmosis Or Uv Based; Upto 3; Package-4 : Water Purifier And Conditioning System Maintenance Involving Basic Servicing .. Annual Maintenance Services For Water Purification And Conditioning System Version 2 - Potable Water Purification System Reverse Osmosis Or Uv Based; 5 To 7; Package-4 : Water Purifier And Conditioning System Maintenance Involving Basic Servicing ..
Annual Maintenance Services For Water Purification And Conditioning System Version 2 - Potable Water Purification System Reverse Osmosis Or Uv Based; 5 To 7; Package-5 : Water Purifier And Conditioning System Maintenance Involving Basic Servicing ..
Balance Work Including, Testing Of Oht 40Kl/15Mtr, 60Kl/15Mtr. And 02 Nos. 50Kl/15Mtr. Capacity And Staging, Providing And Laying Of 90Mm Dia. 06Kg/Cm2-298 Mtr. 110Mm 06Kg/Cm2-52 Mtr. And Construction Of Fhtc 688 Nos. Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Boida, Gopalpur, Kodar And Murli Block- Podi Uproda
Constrution Of Oht/Sump Well 25 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-379 Mtr. 75Mm 10Kg/Cm2-1516 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Samlai Block- Podi Uproda
Constrution Of Sump Well 60 Kl & 30 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-3152 Mtr. 75Mm 10Kg/Cm2-788 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Dhodhatarai & Dhandhani Block- Kartala
Constrution Of Sump Well 70 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-1772 Mtr. 75Mm 10Kg/Cm2-443 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Tarda Block- Kartala
Constrution Of Sump Well 70 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-2200 Mtr. 75Mm 10Kg/Cm2-550 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Purena Block- Kartala
Constrution Of Sump Well 50 Kl & 25 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-3480 Mtr. 75Mm 10Kg/Cm2-870 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Saragbundiya Block- Kartala
Constrution Of Sump Well 40 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-1776 Mtr. 75Mm 10Kg/Cm2-444 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Junwani Block- Kartala
Constrution Of Sump Well 60 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-1760 Mtr. 75Mm 10Kg/Cm2-440 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Pahanda Block- Korba
Constrution Of Sump Well 80 Kl & 25 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-1640 Mtr. 75Mm 10Kg/Cm2-660 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Dongdarha Block- Korba
Constrution Of Sump Well 70 Kl & 60 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-1080 Mtr. 75Mm 10Kg/Cm2-270 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Dondro Block- Korba
Constrution Of Sump Well 85 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-2800 Mtr. 75Mm 10Kg/Cm2-700 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Bhaisma Block- Korba
Constrution Of Sump Well 30 Kl & 65 Kl, Upvc/Hdpe Pipe 90Mm 10Kg/Cm2-2960 Mtr. 75Mm 10Kg/Cm2-740 Mtr. For Rising Main 50 Mm Dia Gi Pipe Class Medium, Valve Specials And All Fittings, With Installation Of Chlorinator And Pumps Including All Allied Civil Works, With Trial Run Of Completed Scheme For Operation & Maintainence For 09 Nine Months Of Single Village Scheme Under Jal Jeevan Mission Jjm At Village Masan & Patadhi Block- Korba
Annual Maintenance Services For Water Purification And Conditioning System Version 2 - Potable Water Purification System Reverse Osmosis Or Uv Based; 10 And Above; Package-5 : Water Purifier And Conditioning System Maintenance Involving Basic Servi..
Design, Supply, Installation, Testing And Commissioning Of Ro Plant Of 500 Litres Hr Permeate Capacity Along With Cleaning In Place System Cip And 50 Lph Lab Q Polishing Unit Ultra Pure Water Unit Along With Allied Works For Dtl At Governme
Supply Of 7 Stage Ro+Uv Water Cooler Cum Purifier, Cooling Capacity 60 Litres/Hour, Storage Capacity 80 Litres, Ro Membrane Thin Film Composite 80 Gpd X 4, Ro Membrane Rating 4 Nos. X 80 Gpd O R Equivalent, % Recovery Of Purified Water 0.25% Reduction In Tds 90% Approx. Uv Water Purifier Confor Ms Is 14724: 1999 Or Latest, Life Of Ro Filters Liters: I0000-12000. Output Quality Of Water In Tds Post Filtra Tion: <200 The Water Cooler Shall Be As Per Specification. Copy Attached. Warranty Period: 60 Month S After The Date Of Delivery
Installation Of Water Purifier With Filteration Media For Common People Near Jukhia Gp Office
Installation Of Water Cooler With Purifier At Baghadari Icds