Tenders for Consultation Paper On The Proposed Norms For Determining Generic Tariff For Electricity Generated From Mini Hydel, Bagasse Based Co – Generation And Biomass Based Power Plants To Be Commissioned During The Control Period 1/04/2024 To 31/3/2027