Tenders for Design, Supplying. Fabrication, Erection And Commissioning Including 3 Three Months Trial Run Of 135m3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Water Disposal At Head Work Site Under Kushida