Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturer?S Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Thermal Power Station Ii Under Single Epc Basis.
Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturers Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Mettur Thermal Power Station Ii Under Single Epc Basis
Supply of Fabrication Overhead Roof Shelter Tool Store Size 20 Ft X 46 Ft 920 Sq Ft Q3 Fabrication Overhead Roof Shelter Tss Size - 20 X 46 920 Sq Feet Storage Of Oh Spares Q3