Supply Of Mandatory Spares For Plc Of Vfd
Supply of Spares For Cnc Lcw Ttm & Lvd-I & Ii Machines.. Bellow Y-Axis Optical 6020 Ly-Axis Guide Bellow Big 126 Folds Thermic We Lded Lvd Part No. M7540026 Or Rcf Drg. No. Y-Axis Guide Way/Lvd-I/Cnc-Ii/Mtc/Big. Note: - C Onsignee Inspection Is Mandatory As The Spares Have To Be Physicaly Inspected On T He Machine. Warranty Period: 30 Months After The Date Of Delivery Fire Retardent Thermic Welded Z - Axis Round Bellow Small As Per Rcf D Rg. No. Z- Axis Bellow/Small/Lvd-I & Ii / Cnc-Ii/Mtc/Alt-1. Drg: Rcf Drg.No. Z-Axis Round Bell Ow /Small/Lvd-I & Ii/ Cnc-Ii/Mtc/Alt-1. Note: - Consignee Inspection Is Mandatory As The S Pares Have To Be Physicaly Inspected On The Machine. Warranty Period: 30 Months After The Date Of Delivery X-Axis Guide Bellow With Stainless Steel Flap. Pu Coatted Nylon Rubberise D Polister Fabrics 0.7 Mm Expanded Length 9300 Mm. Coppressed Length- 600 Mm, No. Of Folds- 132 Part-A Drg. No. 136001/X-Axis/Guide Bellow/Cnc-Ii. Part-A. Note: - Consignee I Nspection Is Mandatory As The Spares Have To Be Physicaly Inspected On The Machin E. Warranty Period: 30 Months After The Date Of Delivery
Eot Crane Lot For Forge Bay 1 Of Span 16 M Capacity 3 Mt With Lt Rails And Shrouded Bus Bar Mandatory Spares For Eot Cranes Of Forge Bay 1 Erection Commissioning And Testing Of 3Mt Eot Crane Along With Lt Rails And Shrouded Bus Bay For Forge Bay 1 Eot Crane Lot Of Capacity 20 3Mt For Forge Bay 2 Of Span 30 M With Lt Rails And Shrouded Bus Bar Eot Crane Lot Of Capacity 5Mt For Forge Bay 2 Of Span 30 M Mandatory Spares For Eot Cranes Of Forge Bay 2 Erection Commissioning And Testing Of Eot Cranes Of 20 3Mt Along With Lt Rails And Shrouded Bus Bar For Forge Bay 2 Erection Commissioning And Testing Of Eot Cranes 5Mt For Forge Bay 2
Procurement Of Neos Pump With Mandatory Spare -Pump For Tag No :9500-060-Pa-019 A/B/D As Per Attached Technical Specification., Mandatory Spares For Pump Tag No :9500-060-Pa-019 A/B/D As Per Attached Technical Specification.
Design, Engineering, Manufacture, Shop Testing, Appointing And Arranging For Inspection By Tpia, Packing And Forwarding, Transportation, Supply Of Ups System Including Commissioning Spares, Mandatory Spares, One Year O And M Spares Etc.
Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturer?S Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Thermal Power Station Ii Under Single Epc Basis.
Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturers Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Mettur Thermal Power Station Ii Under Single Epc Basis
Supply of 3 1999992344 Complete Pump Assy+ Motor Cpcl 212G103ab Q3 1999992354 Set Of Mandatory Spares For 212G103ab Q3
Procurement Of Mandatory Spares Of Electric Hoist - Brake Lining, 050054575, 4603 And 6, Tractel, Brake Lining, 050054575, 4603 And 7, Tractel, Brake Lining, 050054575 And 6, Tractel, Brake Lining, 050054575 And 7, Tractel, Brake Lining, 050054603 And 6, Tractel, Brk Lin Assy F Tra, Tractel Tirfor, 3T, Brk Lin Assy F Hoist, Tractel Tirfor, 4T, Brk Lin Assy F Tra, Tractel Tirfor, 4T, Brk Lin Assy F Hoist, Tractel Tirfor, 5T, Brk Lin Assy F Tra, Tractel, 5T, Brake Lining, 6, Tractel, Hoist, 10T, Brake Lining, 050054575 And 7, Tractel Tirfor, Brake Lining, 050054575 And 6, Tractel Tirfor, Rop Guide And Tightnr, 0500, Tractel Tirfor, Rop Guide And Tightnr, 05005, Tractel Tirfor, Rope Guide And Tightnr, 05-005-4575, Tractel, Limit Switch, 050054575 And 12, Tractel Tirfor, Gear Box Assy, 050054603 And 1, Tractel Tirfor, Gear Box, 050054575 And 1, Tractel Tirfor, 1T, Gear Box, 050054575 And 1, Tractel Tirfor, 2T, Gear Box, 050054603 And 1, Tractel Tirfor, 3T, Gear Box, 050054575 And 1, Tractel Tirfor, 4T, Gear Box, 050054603 And 1, Tractel Tirfor, 5T, Gear Box, 050054575 And 1, Tractel Tirfor, 5T, Gear Box, 050054603 And 1, Tractel Tirfor, 10T, Gear Box, 050054575 And 1, Tractel Tirfor, 10T, Gear Box, 050054603 And 1, Tractel Tirfor, 15T, Gear Box, 050054575 And 1, Tractel Tirfor, 15T, Gear Box, 050054575 And 1, Tractel Tirfor, 20T, Motor, 050054575 And 4, Tractel Tirfor, 1T, Motor, 050054575 And 5, Tractel Tirfor, 1T, Motor, 050054575 And 4, Tractel Tirfor, 2T, Motor, 050054575 And 5, Tractel Tirfor, 2T, Motor, 050054603 And 4, Tractel Tirfor, 3T, Motor, 050054603 And 5, Tractel Tirfor, 3T, Motor, 050054575 And 4, Tractel Tirfor, 4T, Motor, 050054575 And 5, Tractel Tirfor, 4T, Motor, 050054575 And 4, Tractel Tirfor, 5T, Motor, 050054575 And 5, Tractel Tirfor, 5T, Motor, 050054575 And 4, Tractel Tirfor, 10T, Motor, 050054575 And 5, Tractel Tirfor, 10T, Motor, 050054575 And 4, Tractel Tirfor, 15T, Motor, 050054575 And 5, Tractel Tirfor, 15T, Motor, 050054575 And 4, Tractel Tirfor, 20T, Motor, 050054575 And 5, Tractel Tirfor, 20T
Supply of Fans Axial And Centrifugal Type 21 Wall Mounted Axial Supply Air Fan For Compressor Room Wall Mounted Axial Supply Air Fan For Mcc Room Wall Mounted Axial Supply Air Fan For Cable Vault Room Wall Mounted Axial Exhaust Air Fan For Compressor Room Wall Mounted Axial Exhaust Air Fan For Mcc Room Wall Mounted Axial Exhaust Air Fan For Cable Vault Room Wall Mounted Axial Exhaust Air Fan For Battery Room Propeller Type Exhaust Air Fan For Toilet Block 1 Propeller Type Exhaust Air Fan For Toilet Block 2 Centrifugal Fan For Silo 1 Centrifugal Fan For Silo 2 Centrifugal Fan For Silo 3 Mandatory Spares As Per Technical Specification
Supply of 13 Price Of Group A1: Pump Reciprocating Api 675 B559-Mr-5003 Q3 Transportation Charges For Group A1: Pump Reciprocating Api 675 B559-Mr-5003 Q3 Mandatory Spares Price Group A1: Pump Reciprocating Api 675 B559-Mr-5003 Q3 Supervision Charges For Group A1: Pump Reciprocating Api 675 B559-Mr-5003 Q3
Supply Of Ball Valves For 2X660 Mw Talcher Tps, 566 15 Nb Ball Valves Commissioning Spares For 15 Nb Valves Mandatory Spares For 15 Nb Valves 25 Nb Ball Valves Commissioning Spares For 25 Nb Valves Mandatory Spares For 25 Nb Valves 50 Nb Ball Valves Commissioning Spares For 50 Nb Valves Mandatory Spares For 50 Nb Valves 80 Nb Ball Valves Commissioning Spares For 80 Nb Valves Mandatory Spares For 80 Nb Valves 200 Nb Ball Valves Commissioning Spares For 200 Nb Valves Mandatory Spares For 200 Nb Valves
Supply of 3 Completely Assembled Uop Ccr Lock Hopper Regeneration Oxygen Analyser Ai424383 With Probe & Remote C Q3 Mandatory Spares For Ai424383 O2 Analyser Ccr# 2 Lock Hopper Regeneration Q3 Installation & Commissioning For Up Gradation Of Ccr# 2 Lh O2 Analyser Q3
Supply of Horizontal Centrifugal Pump Dec Management System Pump Q3 Mandatory Spares For Pumps Complete With All Accessories As Specified In Technical Specification Q3
Design, Manufacture, Inspection And Testing, Packing And Delivery Of Scs Complete With All Accessories Including E And C Spares As Applicable- Scs F-Nw S-150 C-Dcs, Installation Checks And Commissioning At Site- Lump Sum Visit Charges For Engineer Including Travel Except Daily Charges, Installation Checks And Commissioning At Site- Lump Sum Daily Charges For Engineer Including Boarding Lodging, Local Conveyance, Medical, Insurance Etc, Mandatory Sparesmeasuring Instruments - All Type Of Transmitters Including Sensors Of Each Type And Model, Mandatory Sparesmeasuring Instruments - Limit Switches For Isolation Valvesof Each Type, Mandatory Spares- Measuring Instruments - Local Indicators Like Temperature Gauges, Pressure Gauges, Differential Pressure Gauges, Flow Gauges, Flow Meters Etcof Each Make, Model And Type, Etc
Supply of Complete Igbt Converter & Associated Component Of Aux Converter As Per Spec Ps407537 Rev. 01 Item# 1 Q3 Mandatory Spares For Igbt Converter & Components Of Aux Converter As Per Spec Ps407537 Rev. 01 Item# 2 Q3 Programming Tool With Software Hardware Emulators As Per Spec Ps407537 Rev. 01 Item# 3 Q3
Supply of Closed Circuit Tv, 9 Basic Supply Price Including Gst Site Work Charges Including Gst Mandatory Spares Price Including Gst Transportation Charges Including Gst Supervision Charges Including Gst Training Charges Including Gst
Procurement Of Complete Pump With Motor For Hdt Compressors Cooling Water Service With Mandatory Spares
Procurement Of Oil Module And Its Mandatory Spares - Oil Module Unit As Per Docum- -Ent No. 4-11939-J3500 Size L2, Oil Module Unit As Per Docum- -Ent No. 4-11939-J3500 Size L2, Pressure Relief Valve Of Jacking Oil System L2-Module Kks Tag Mav35aa151 Set Pressure 155Bar Size L2, Complete Assembly Of Main Oil Pump Without Motor With Compl Ete Coupling Design Q - 69.4Lps, Design Pr. 6+/-0.3Bar Size L2, Complete Assembly Of Emergency Oil Pump With Dc Motor For L2 Oil Module, Complete Assembly Of Lifting Oil Pump With Ac Motor Size T7e 050, Following Spares For 3Way Temp Erature Control Valve For L2 Module 1.Valve Trim Incl Cage, Plug, Stem, Seat Rings, Guide Bushings Etc.-1Set 2.Orings, Seals Of All Types-1 Set Size L2, Oil Throttle Valve In Lube Oil Header For L2-Module Kks Tag Mav21aa251 Size L2, For 2X660 Mw Mahan Project
Supply Of Main Equipments-Cast Iron Deluge Valve - 150 Nb For Yadadri Project, Supply Of Main Equipments-Cast Iron Deluge Valve - 80 Nb For Yadadri Project, Supply Of Main Equipments-Cast Iron Deluge Valve - 100 Nb For Chilla Hep, Supply Of Main Equipments-Cast Iron Deluge Valve - 100 Nb For Panchet Hep, Supply Of Mandatory Spares - Cast Iron Deluge Valve - 150 Nb For Yadadri Project, Supply Of Mandatory Spares - Cast Iron Deluge Valve - 80 Nb For Yadadri Project, Supply Of Mandatory Spares - Cast Iron Deluge Valve - 100 Nb For Chilla Project