Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturer?S Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Thermal Power Station Ii Under Single Epc Basis.
Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturers Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Mettur Thermal Power Station Ii Under Single Epc Basis
Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2012 Ver.-3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Alo Ng With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 /0002-10 For Ibs With Lc Gate .This Includes Transporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 3 0 Months After The Date Of Delivery Supply, Installation, Testing And Commissoning Of Smps Based Integrated Power Supply Ipssys Tem As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver 3.0 Aiong With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cellsas Per Rdso Spece.Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0002-11 For Relay Hu T /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Dep Ot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling Precommissioning C Heck List Jointly By Rdso Approved Vendor And Railway Representative.Item Shall Be Procured Though Store Wi Th Gst, Frieght And Commissioning Charges.This Includes Transporation To Consignee Depot, From C Onsignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply And Comissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver. 4. 0 Amdt.1 As Per Drawing Attached Of Along With Battery Set Of 110V/300Ah.This Includes Tr Ansporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Del Ivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 A Long With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee Depot From Consi Gnee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commi Ssioning Check List Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To C Onsignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System I Ps , As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitori Ng Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rdso Spec. Irs-S-88/2004 Al Ong With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate.This Include Transporation To Consignee Depot To Site, Installatio N And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To Consignee Depot, From Consig Nee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery
Iaden Manmad-Provision Of One Common Room For Data Logger Eld Fuse Alarm Monitoring System & Storing S&T Critical Maintenance Spares At Ghoti, Devlali, Odha, Niphad, Lasalgaon, Summit, Ls-Sum Ibh 07 Locations Under Aden Mmr Section. Id No.01.01.33.23.1.50.001. Ii Replacement Of Indoor And Outdoor Signaling Gear Of Interlocked Lc Gate No. 87 Dvl-Nk & 94 Od-Kw On Bsl Division In Connection With Replacement Of Old Age Indoor & Outdoor Signaling Gears In New Relay Room & Power Room At Interlocked Lc Gates No.87 & 94 Od-Kw On Bsl Division.Dpwp 2023-24.Id- 01.01.29.23.4.50.002 Iiinasik Road-Proposed Extension Of Rpf Barrack On First Floor Of Existing Building At Nasik Road Station. Id-01.01.64.23.3.50.003.